Service 03, Digital MRV Data Room

An auditor-ready evidence room, one project at a time.

A secure workspace for monitored data, meter evidence, calibration records, QA/QC procedures, generation data, and verification-ready evidence. Every artefact version-stamped, source-linked, and audit-trailed.
Service 03

Digital MRV Data Room

Verification failures and findings almost always trace back to evidence problems: missing calibration certificates, untraceable meter readings, no QA/QC log, or a baseline document with no source. Our MRV data room is purpose-built for the GCOM lifecycle. It organises evidence the way a VVB reviews it, not the way a project owner usually stores it.

Deliverables

What you receive at the end of the engagement.

Monitoring evidence dashboard
Meter registry
Calibration tracker
Monthly generation uploads
QA/QC log
Audit trail
Monitoring report draft

In scope

  • Secure project workspace with role-based access
  • Meter registry with serial number, location, accuracy class, calibration date
  • Calibration tracker with reminders for upcoming expiries
  • Monthly generation data ingestion (CSV upload or API)
  • QA/QC procedure log with QA flags (ok / estimated / gap / corrected)
  • Document versioning and immutable audit trail
  • Monitoring report draft generation aligned with GCOM Monitoring Form
  • Bilingual EN and AR labels and export

Not in scope

  • Field meter installation or calibration services
  • On-site monitoring engineer (we coordinate, do not staff)
  • Verification opinion (DNA-accredited VVB only)
Engagement pre-requisites

What we need from you to begin.

  • Meter list with locations and tags
  • Latest calibration certificates
  • Existing monitoring procedure (if any) or willingness to author one
  • Data export capability from SCADA, EMS, or equivalent system
GCOM rulebook references

Grounding clauses we work to.

  • GCOM Criteria s.3.2.1
    Verification confirms reported emission reductions are real, verified, and additional under the PDD requirements.
  • GCOM Monitoring Form, Section A
    Monitoring period, version, completion date, and monitored parameters must be documented per project.
  • GCOM Standards s.5
    Document control, record control, audit trail, and secure evidence repository required.
Important disclaimer

Renewable Vision is not presented as a DNA-accredited VVB unless formal accreditation has been obtained. We support project preparation, MRV evidence management, and coordination with accredited VVBs. Validation and verification opinions must be issued only by DNA-accredited VVBs.