Story charts

The build-out, in five charts

Each chart reads the same public data as the atlas and the trackers, says where every figure comes from, and downloads as an image or as its data.

The GCC build-out race

Installed solar and wind by country, year by year, then each country's tracked pipeline to 2030 on top, hatched.

2025
020406080Installed capacity, GWSaudi Arabia12.3 GWUAE7.6 GWOman1.7 GWQatar1.7 GWKuwait0.1 GWBahrain0.1 GW2025
  • Solar, installed (IRENA)
  • Wind, installed (IRENA)
  • Tracked pipeline, expected by the year shown

Pipeline counts tracked projects expected to operate after IRENA's latest year, by their stated or expected year; it is not a forecast. IRENA data to 2025; later years add the tracked pipeline.

Source: International Renewable Energy Agency (IRENASTAT); Renewable Vision, the Saudi and GCC renewables trackers. Licence: IRENA, free for non-commercial use with attribution; CC BY-NC 4.0 (Saudi tracker); Compiled from public sources (GCC and captive). As of 2026-09-24; 2026-09-24.

Sun against tariff

Every published solar tariff against the long-run sunlight at the project's locality. Sunlight varies little across the region; the price fell with each tender round.

024685.65.866.26.46.6Global horizontal irradiance at the locality, kWh/m²/day (NASA POWER, 0.5° cell)Published tariff, US cents/kWhLowest: Shuaibah 1, 1.04 US cents/kWh
  • Colour by tender or award year
  • ≤2017
  • 2018–19
  • 2020–21
  • 2022–23
  • 2024+
  • Year not stated

Tariffs as the procurer or developer published them (the Saudi tracker's tendered levelised cost). Dirham tariffs converted at the fixed peg of 3.6725 AED per US dollar. Solar PV and CSP only.

Source: Renewable Vision, the Saudi and GCC renewables trackers; NASA Langley Research Center, POWER Project (NASA POWER). Licence: CC BY-NC 4.0 (Saudi tracker); Compiled from public sources (GCC and captive); NASA POWER public domain. As of 2026-09-24; 2026-09-24.

Who builds what

Developers to countries or technologies to stages, in megawatts. Hover a band to follow it.

Middle column

Swipe sideways to follow the flows.

ACWA Power → Saudi Arabia: 22.7 GWACWA Power → UAE: 0.5 GWACWA Power → Oman: 0.3 GWMasdar → Saudi Arabia: 5.4 GWMasdar → UAE: 8.8 GWMasdar → Oman: 0.2 GWBadeel → Saudi Arabia: 5.2 GWSaudi Aramco Power → Saudi Arabia: 4.6 GWEDF Renewables → Saudi Arabia: 3.2 GWEDF Renewables → UAE: 0.6 GWEDF Renewables → Oman: 0.3 GWQatarEnergy → Qatar: 2.9 GWJinko Power → Saudi Arabia: 2 GWJinko Power → UAE: 0.5 GWJinko Power → Oman: 0.1 GWDEWA → UAE: 2.1 GWKEPCO → Saudi Arabia: 1.5 GWMarubeni → Saudi Arabia: 0.9 GWMarubeni → UAE: 0.2 GWMarubeni → Qatar: 0.2 GWMarubeni → Oman: 0 GWTAQA → UAE: 1.2 GWOther developers → Saudi Arabia: 5.1 GWOther developers → UAE: 1.6 GWOther developers → Qatar: 0.6 GWOther developers → Oman: 1.6 GWOther developers → Kuwait: 0.1 GWOther developers → Bahrain: 0.1 GWDeveloper not published → Saudi Arabia: 20 GWDeveloper not published → UAE: 3.5 GWDeveloper not published → Oman: 0.5 GWDeveloper not published → Kuwait: 1.6 GWDeveloper not published → Bahrain: 0.1 GWSaudi Arabia → Operating: 12.8 GWSaudi Arabia → Under construction: 35 GWSaudi Arabia → Contracted: 0.1 GWSaudi Arabia → Tendered: 22.6 GWUAE → Operating: 5.6 GWUAE → Under construction: 10 GWUAE → Tendered: 2 GWUAE → Announced: 1.5 GWQatar → Operating: 1.7 GWQatar → Contracted: 2 GWOman → Operating: 1.7 GWOman → Contracted: 0.7 GWOman → Tendered: 0.5 GWKuwait → Operating: 0.1 GWKuwait → Tendered: 1.6 GWBahrain → Under construction: 0.1 GWBahrain → Tendered: 0.1 GWACWA Power 23.5 GWMasdar 14.4 GWBadeel 5.2 GWSaudi Aramco Power 4.6 GWEDF Renewables 4.1 GWQatarEnergy 2.9 GWJinko Power 2.6 GWDEWA 2.1 GWOther developers 9 GWDeveloper not published 25.7 GWSaudi Arabia 70.6 GWUAE 19.1 GWQatar 3.7 GWOman 2.9 GWKuwait 1.7 GWBahrain 0.2 GWOperating 21.8 GWUnder construction 45.1 GWContracted 2.8 GWTendered 26.8 GWAnnounced 1.5 GW

Each project's capacity is split by the equity shares its developers publish, and equally where none is published. The eleven largest developers are named; the rest are grouped.

Source: Renewable Vision, the Saudi and GCC renewables trackers. Licence: CC BY-NC 4.0 (Saudi tracker); Compiled from public sources (GCC and captive). As of 2026-09-24.

From tender to operation

Each line runs from a project's tender to its award and to its commercial operation, filled where operation happened and hollow where it is expected.

Group by
2015202020252030TodayRound 1Round 2Round 3Round 4Round 5Round 6Round 7PIF programme
  • Tender
  • Award
  • Operation
  • Expected operation

Years as the tracker or the source states them. A project with no stated tender year starts at its award or operation.

Source: Renewable Vision, the Saudi and GCC renewables trackers. Licence: CC BY-NC 4.0 (Saudi tracker); Compiled from public sources (GCC and captive). As of 2026-09-24.

The sun through the year

Monthly irradiance at the town with the most tracked capacity in each of four countries, from NASA's twenty-year climatology.

3456789JanFebMarAprMayJunJulAugSepOctNovDecGlobal horizontal irradiance, kWh/m²/day
  • Al Hinakiyah
  • Dukhan
  • Manah
  • Sweihan

Source: NASA Langley Research Center, POWER Project (NASA POWER), climatology 2001–2020. Licence: Public domain (NASA POWER). As of 2026-09-24.