Skip to content
عربي
A pipeline corridor running across desert terrain at dawn.

Projects & Development

We develop renewable and low-carbon energy projects.

Hydrogen and clean fuels, industrial decarbonisation and carbon capture-to-value projects with Saudi industrial hosts, from source screening to monetisation.

Scope

What we develop

Three development tracks. Each one starts from a CO2 source, a power and feedstock position, and an industrial host.

Hydrogen and clean fuels

Combining captured CO2 with green hydrogen from electrolysis into synthesis routes, or producing hydrogen derivatives directly for export and domestic offtake.

Covered in this track

  • e-Methanol
  • Synthetic aviation fuel (e-SAF)
  • Green ammonia

Industrial decarbonisation with hosts

Abatement projects developed inside an existing industrial site, where the host's own process, utilities and export exposure set the order in which measures are worth doing.

Covered in this track

  • Energy-efficiency and heat-recovery measures
  • Fuel switching and electrification
  • Integration of capture into an operating plant

Carbon capture-to-value

Capturing CO2 at an industrial source or from the air, then routing it into a product, a storage position or a documented carbon claim rather than treating it as a disposal cost.

Covered in this track

  • Point-source capture on industrial flue gas
  • Direct air capture (DAC) screening
  • Mineralisation into construction materials
Hydrogen electrolysers in an operating hall.
Fig 01Hydrogen electrolysers: the first input to clean-fuel synthesis.

Development model

How we develop

Six stages, end to end. Each stage closes on a document someone else can check.

  1. Discover

    Identify CO2 sources, hydrogen availability, water and feedstock constraints, capture options, and site-specific economics.

  2. Structure

    Select technology partners, the commercial model, offtake routes, the MRV approach, logistics and the financing pathway.

  3. Develop

    Build the project case, the techno-economic model, the implementation roadmap, permitting logic and commercial documentation.

  4. Verify

    Integrate measurement, reporting and verification (MRV), audit trails, claim traceability, credit readiness and buyer documentation, with opinions issued by accredited bodies.

  5. Monetise

    Route captured carbon and produced hydrogen into products, credits, offtake agreements, storage or compliance value.

  6. Scale

    Reinvest into capacity, replicate the playbook across hosts, and extend across the GCC.

Economics at every stage are our own models, marked indicative until validated.

Record

Current work

Where the pipeline stands today, and the in-house products that carry the work.

Stage
Screening, structuring and pre-investment
Pilot projects
Being structured with partnersCapacity, tonnage and revenue figures are published once a pilot is confirmed.

Feasibility study · 2025

Saudi Port and Hydrogen Derivatives Feasibility

Pre-investment screening of green ammonia and e-fuels production off a Saudi industrial port, covering offtake, capex and routing.

In-house thesis · 2024

Saudi Carbon Management Platform Thesis

A structured thesis integrating CO2 management, hydrogen monetisation, MRV and digital intelligence.

In-house build · 2025

RV-CMP Carbon Management Engine

Screening engine for CO2 pathways, hydrogen, e-fuels, MRV, credits and mineralisation economics. Live as a digital product.

In-house build · 2025

RV Energy Dashboard

13-section national dashboard, 52 datasets. Live as a digital product.

The in-house tools listed here are live products, not projects. Selected work on the About page

Counterparties

Who we develop with

A project of this kind brings together five kinds of counterparty. Partners are named once agreements are in place.

Industrial hosts
Operators of cement, refining, petrochemical, power and port assets with a CO2 source and a site that can host equipment.
Technology providers
Capture, conversion and MRV technology firms whose equipment or method is screened into a pathway.
Offtakers and buyers
Buyers of low-carbon products and of verified carbon credits, including parties facing the EU Carbon Border Adjustment Mechanism (CBAM) and CORSIA obligations.
Capital partners
Strategic investors, infrastructure funds and climate-finance vehicles that underwrite a structured project.
Government and public bodies
Ministries, regulators and standard-setters whose published frameworks a project has to satisfy.

Renewable Vision is independent of every ministry, national programme and regulatory body.

How we work

Development, advisory and verification stay separate.

Project economics on this site come from our own models and are published as indicative until validated at pilot scale. Verification is always carried out by independent accredited bodies.

Renewable Vision is not a DNA-accredited Validation and Verification Body.

Independence
Our assurance line is designed to stay separate from advisory through eight controls: separate staff, separate reporting line, separate document access, separate client engagement records, an independent review committee, restricted project assignment, automated conflict screening, and a signed declaration before any assurance engagement is accepted.

Have a CO2 source, a site, or capital to place?

Tell us the asset, the sector and the constraint. We reply with what the screening stage would cover, what we would need from you, and what it would cost.