GCC Renewables Tracker
Al Dur Solar PV
A 100 MW solar PV project at Al Dur, Southern Governorate, Bahrain. Stage: Under construction.
The record
What the sources publish for this project
- Capacity
- 100 MW
- Technology
- Solar PVAbout 135,000 panels on two adjacent sites of about 830,000 m²
- Stage counted on this site
- Under constructionAs published: “Construction begun; completion scheduled for the third quarter of 2026” (PV Tech)
- Operation date, stated target
- Q3 2026
- Owners and developers
- EWA (owner, developer; 100%)
- Supplies
- EWA
- Procurer
- EWA
- Arrangement
- Built and owned by a state entity
- Country
- Bahrain
- Location
- Al Dur, Southern Governorate, BahrainLocality and region only; plant coordinates are not published
Connected through the 66/11 kV Al Dur substation (PV Tech).
Modelled output
Estimated annual generation
205
GWh a year
23.4%
Capacity factor
1% of the modelled output of this tracker’s under-construction solar projects.
- Fixed at the optimal tilt174 GWh19.9%1,741 kWh per kWp
- Single-axis trackerCounted here205 GWh23.4%2,046 kWh per kWp
Yield read at the centre of Al Dur, rounded to 0.1°. Mounting assumed: plants of 50 MW and more on single-axis trackers, smaller ones fixed.
Annual kWh per kWp from PVGIS for crystalline silicon with 14% system loss, multiplied by the capacity as the source states it and taken as peak. A plant rated in MWac carries more DC capacity, so its estimate runs low.
Tracker totals, modelled
| Stage | Projects | Capacity, MW | GWh a year | Capacity factor |
|---|---|---|---|---|
| Operational | 11 / 12 | 7,575 | 15,709 | 23.7% |
| Under construction | 5 / 5 | 10,100 | 21,171 | 23.9% |
| Contracted | 2 / 2 | 2,500 | 5,181 | 23.7% |
| Tendered | 5 / 5 | 4,200 | 8,559 | 23.3% |
| Announced | 1 / 1 | 1,500 | 3,155 | 24% |
Solar yield: PVGIS 5.2 (PVGIS-SARAH2), European Commission, Joint Research Centre. © European Union. Estimate as JSON
Sources
Where each figure comes from
| Publisher | Publication | Published | Read on | Kind |
|---|---|---|---|---|
| PV Tech | Bahrain has begun building 100MW Al Dur solar PV project | December 2025 | 24 September 2026 | Press or compiler |
Solar and wind resource
The resource at Southern Governorate
NASA POWER's long-run means for the 0.5° cell that holds the locality: an area-level picture, not a site measurement.
5.60 kWh/m²/day
Global horizontal irradiance
About 2,044 kWh/m² a year
4.06 kWh/m²/day
Direct normal irradiance
5.7 m/s
Wind at 50 m
27.4 °C
Air temperature
Warmest month August, 35.6 °C
Aerosol optical depth: 0.56 · Dustiest month July
| January | 3.82 |
|---|---|
| February | 4.58 |
| March | 5.48 |
| April | 6.04 |
| May | 6.90 |
| June | 7.36 |
| July | 6.98 |
| August | 6.72 |
| September | 6.24 |
| October | 5.28 |
| November | 4.04 |
| December | 3.62 |
Source: NASA Langley Research Center POWER Project, climatology 2001–2020, public domain; retrieved 2026-09-24. Cell N25.5E50.5, native resolution 1° (CERES SYN1deg). These data were obtained from the NASA Langley Research Center (LaRC) POWER Project funded through the NASA Earth Science/Applied Science Program.
GCC Renewables Tracker, 24 September 2026 (2026-09)