Bilaj Al Jazayer Solar IPP

A 100 MW solar PV project at Near Bilaj Al Jazayer, Bahrain. Stage: Tendered.

The record

What the sources publish for this project

Capacity
100 MWEWA announced the project at up to 150 MW; the tender is for 100 MW.
Technology
Solar PV
Stage counted on this site
TenderedAs published: “Two bids received” (Zawya (via TradingView News))
Tender
16 October 2025
Operation date, stated target
Q3 2027
Owners and developers
No owner or developer is named in a public source yet
Supplies
EWA
Procurer
EWA
Arrangement
Independent power project with a power purchase agreementTerm: 25 years
Country
Bahrain
Location
Near Bilaj Al Jazayer, BahrainLocality and region only; plant coordinates are not published

Build-own-operate, with a 25-year power purchase agreement with EWA. The bid prices are not shown: no award has been announced.

Modelled output

Estimated annual generation

Modelled, not measured

209

GWh a year

23.8%

Capacity factor

2.4% of the modelled output of this tracker’s tendered solar projects.

  • Fixed at the optimal tilt178 GWh20.3%1,779 kWh per kWp
  • Single-axis trackerCounted here209 GWh23.8%2,088 kWh per kWp

Yield read at the centre of Bilaj Al Jazayer, rounded to 0.1°. Mounting assumed: plants of 50 MW and more on single-axis trackers, smaller ones fixed.

Annual kWh per kWp from PVGIS for crystalline silicon with 14% system loss, multiplied by the capacity as the source states it and taken as peak. A plant rated in MWac carries more DC capacity, so its estimate runs low.

Tracker totals, modelled

Solar projects with an estimate only; the counted mounting for each.
StageProjectsCapacity, MWGWh a yearCapacity factor
Operational11 / 127,57515,70923.7%
Under construction5 / 510,10021,17123.9%
Contracted2 / 22,5005,18123.7%
Tendered5 / 54,2008,55923.3%
Announced1 / 11,5003,15524%

Solar yield: PVGIS 5.2 (PVGIS-SARAH2), European Commission, Joint Research Centre. © European Union. Estimate as JSON

Sources

Where each figure comes from

PublisherPublicationPublishedRead onKind
EWAEWA announces the launch of Bahrain's first solar power plant in collaboration with the private sector7 August 202524 September 2026Procurer, developer or owner
Zawya (via TradingView News)Bahrain's EWA receives two bids for 100 MW BAJ Solar IPP22 June 202624 September 2026Press or compiler

Where sources disagree

Both readings, and the one counted

Capacity

  • Up to 150 MW — EWA
  • 100 MW — Zawya (via TradingView News)

Counted on this site: 100 MW

Why: The capacity put out to tender; the earlier figure was an upper bound in the launch announcement.

Solar and wind resource

The resource at Bahrain

NASA POWER's long-run means for the 0.5° cell that holds the locality: an area-level picture, not a site measurement.

5.40 kWh/m²/day

Global horizontal irradiance

About 1,971 kWh/m² a year

3.82 kWh/m²/day

Direct normal irradiance

5.7 m/s

Wind at 50 m

27.0 °C

Air temperature

Warmest month August, 34.6 °C

Aerosol optical depth: 0.56 · Dustiest month July

Global horizontal irradiance by month, kWh/m²/day
January: 3.62 kWh/m²/dayJanFebruary: 4.36 kWh/m²/dayFebMarch: 5.20 kWh/m²/dayMarApril: 5.80 kWh/m²/dayAprMay: 6.68 kWh/m²/dayMayJune: 7.20 kWh/m²/dayJunJuly: 6.80 kWh/m²/dayJulAugust: 6.54 kWh/m²/dayAugSeptember: 6.02 kWh/m²/daySepOctober: 5.06 kWh/m²/dayOctNovember: 3.86 kWh/m²/dayNovDecember: 3.44 kWh/m²/dayDec
January3.62
February4.36
March5.20
April5.80
May6.68
June7.20
July6.80
August6.54
September6.02
October5.06
November3.86
December3.44

Source: NASA Langley Research Center POWER Project, climatology 2001–2020, public domain; retrieved 2026-09-24. Cell N26.0E50.5, native resolution 1° (CERES SYN1deg). These data were obtained from the NASA Langley Research Center (LaRC) POWER Project funded through the NASA Earth Science/Applied Science Program.

See it on the Energy AtlasResource as JSON