Mohammed bin Rashid Al Maktoum Solar Park, phase 7

A 2,000 MW solar PV and battery project at Mohammed bin Rashid Al Maktoum Solar Park, Dubai, United Arab Emirates. Stage: Tendered.

The record

What the sources publish for this project

Capacity
2,000 MW
Battery storage
1,400 MW, 8,400 MWh
Technology
Solar PV and batteryPhotovoltaic plant with a six-hour battery
Stage counted on this site
TenderedAs published: “Bids received on 1 July 2026; lowest bidder reported, no award announced” (MEED)
Tender
20 October 2025
Owners and developers
No owner or developer is named in a public source yet
Supplies
DEWA
Procurer
DEWA
Arrangement
Independent power project with a power purchase agreement
Country
United Arab Emirates
Location
Mohammed bin Rashid Al Maktoum Solar Park, Dubai, United Arab EmiratesLocality and region only; plant coordinates are not published

Expressions of interest were invited on 16 May 2025 and the request for proposals issued on 20 October 2025. MEED reports Masdar as the lowest bidder; no developer is shown until an award is announced.

Modelled output

Estimated annual generation

Modelled, not measured

4,130

GWh a year

23.6%

Capacity factor

48.3% of the modelled output of this tracker’s tendered solar projects.

  • Fixed at the optimal tilt3,500 GWh20%1,750 kWh per kWp
  • Single-axis trackerCounted here4,130 GWh23.6%2,065 kWh per kWp

Yield read at the centre of Emirate of Dubai: the tracker names no town this model can place. Mounting assumed: plants of 50 MW and more on single-axis trackers, smaller ones fixed.

Annual kWh per kWp from PVGIS for crystalline silicon with 14% system loss, multiplied by the capacity as the source states it and taken as peak. A plant rated in MWac carries more DC capacity, so its estimate runs low.

Tracker totals, modelled

Solar projects with an estimate only; the counted mounting for each.
StageProjectsCapacity, MWGWh a yearCapacity factor
Operational11 / 127,57515,70923.7%
Under construction5 / 510,10021,17123.9%
Contracted2 / 22,5005,18123.7%
Tendered5 / 54,2008,55923.3%
Announced1 / 11,5003,15524%

Solar yield: PVGIS 5.2 (PVGIS-SARAH2), European Commission, Joint Research Centre. © European Union. Estimate as JSON

Sources

Where each figure comes from

PublisherPublicationPublishedRead onKind
SolarQuarterDEWA invites proposals for 2,000MW seventh phase of MBR Solar Park6 November 202524 September 2026Press or compiler
SolarQuarterDEWA showcases seventh phase of Mohammed bin Rashid Al Maktoum Solar Park featuring 2GW PV and 8.4GWh battery storage19 January 202624 September 2026Press or compiler
MEEDLowest bidder emerges for Dewa Solar Park phase seven7 August 202624 September 2026Press or compiler

Solar and wind resource

The resource at Dubai

NASA POWER's long-run means for the 0.5° cell that holds the locality: an area-level picture, not a site measurement.

5.76 kWh/m²/day

Global horizontal irradiance

About 2,102 kWh/m² a year

4.80 kWh/m²/day

Direct normal irradiance

4.5 m/s

Wind at 50 m

28.2 °C

Air temperature

Warmest month August, 35.3 °C

Aerosol optical depth: 0.42 · Dustiest month July

Global horizontal irradiance by month, kWh/m²/day
January: 4.04 kWh/m²/dayJanFebruary: 4.84 kWh/m²/dayFebMarch: 5.72 kWh/m²/dayMarApril: 6.50 kWh/m²/dayAprMay: 7.30 kWh/m²/dayMayJune: 7.40 kWh/m²/dayJunJuly: 6.88 kWh/m²/dayJulAugust: 6.62 kWh/m²/dayAugSeptember: 6.22 kWh/m²/daySepOctober: 5.42 kWh/m²/dayOctNovember: 4.40 kWh/m²/dayNovDecember: 3.82 kWh/m²/dayDec
January4.04
February4.84
March5.72
April6.50
May7.30
June7.40
July6.88
August6.62
September6.22
October5.42
November4.40
December3.82

Source: NASA Langley Research Center POWER Project, climatology 2001–2020, public domain; retrieved 2026-09-24. Cell N25.0E55.0, native resolution 1° (CERES SYN1deg). These data were obtained from the NASA Langley Research Center (LaRC) POWER Project funded through the NASA Earth Science/Applied Science Program.

See it on the Energy AtlasResource as JSON