Al Jouf Cement solar PV, Turaif

A 22 MWp solar PV project at Turaif, Northern Borders. Stage: Contracted.

The record

What the sources publish for this project

Capacity
22 MWpArgaam gives 22 MW; CemNet and Global Energy Monitor give 22 MWp.
Technology
Solar PVGround-mounted plant over more than 420,000 m² at the cement works
Stage counted on this site
ContractedAs published: “Agreement signed to build and operate the plant for 25 years; listed as pre-construction” (Argaam)
Agreement or award
19 November 2024
Owners and developers
Shares as the owners publish them; a company without a share has not published one
Supplies
Al Jouf Cement
Operation and maintenance
ENGIE
Arrangement
Corporate power purchase agreementTerm: 25 years
Country
Saudi Arabia
Location
Turaif, Northern BordersLocality and region only; plant coordinates are not published

The plant is expected to supply about a quarter of the cement works' electricity (Argaam). No later construction or operation announcement was found.

Modelled output

Estimated annual generation

Modelled, not measured

41

GWh a year

21.1%

Capacity factor

31.1% of the modelled output of this tracker’s contracted solar projects.

  • Fixed at the optimal tiltCounted here41 GWh21.1%1,847 kWh per kWp
  • Single-axis tracker50 GWh25.7%2,254 kWh per kWp

Yield read at the centre of Turaif, rounded to 0.1°. Mounting assumed: plants of 50 MW and more on single-axis trackers, smaller ones fixed.

Annual kWh per kWp from PVGIS for crystalline silicon with 14% system loss, multiplied by the capacity as the source states it and taken as peak. A plant rated in MWac carries more DC capacity, so its estimate runs low.

Tracker totals, modelled

Solar projects with an estimate only; the counted mounting for each.
StageProjectsCapacity, MWGWh a yearCapacity factor
Operational6 / 717332921.7%
Contracted3 / 47213120.7%
Observed0 / 100—

Solar yield: PVGIS 5.2 (PVGIS-SARAH2), European Commission, Joint Research Centre. © European Union. Estimate as JSON

Sources

Where each figure comes from

PublisherPublicationPublishedRead onKind
ArgaamAl Jouf Cement, Engie ink deal to build solar power plant19 November 202424 September 2026Procurer, developer or owner
CemNetAl Jouf Cements invests in solar power plant20 November 202424 September 2026Press or compiler
Global Energy MonitorAl Jouf Cement solar farmUndated24 September 2026Press or compiler

Solar and wind resource

The resource at Turaif

NASA POWER's long-run means for the 0.5° cell that holds the locality: an area-level picture, not a site measurement.

5.90 kWh/m²/day

Global horizontal irradiance

About 2,154 kWh/m² a year

6.20 kWh/m²/day

Direct normal irradiance

6.0 m/s

Wind at 50 m

19.5 °C

Air temperature

Warmest month July, 30.3 °C

Aerosol optical depth: 0.29 · Dustiest month May

Global horizontal irradiance by month, kWh/m²/day
January: 3.50 kWh/m²/dayJanFebruary: 4.40 kWh/m²/dayFebMarch: 5.72 kWh/m²/dayMarApril: 6.78 kWh/m²/dayAprMay: 7.62 kWh/m²/dayMayJune: 8.44 kWh/m²/dayJunJuly: 8.22 kWh/m²/dayJulAugust: 7.52 kWh/m²/dayAugSeptember: 6.46 kWh/m²/daySepOctober: 4.96 kWh/m²/dayOctNovember: 3.82 kWh/m²/dayNovDecember: 3.26 kWh/m²/dayDec
January3.50
February4.40
March5.72
April6.78
May7.62
June8.44
July8.22
August7.52
September6.46
October4.96
November3.82
December3.26

Source: NASA Langley Research Center POWER Project, climatology 2001–2020, public domain; retrieved 2026-09-24. Cell N31.5E38.5, native resolution 1° (CERES SYN1deg). These data were obtained from the NASA Langley Research Center (LaRC) POWER Project funded through the NASA Earth Science/Applied Science Program.

See it on the Energy AtlasResource as JSON