Saudi Aramco North Park solar car park
A 10.5 MW solar PV project at Dhahran, Eastern Province. Stage: Operating.
The record
What the sources publish for this project
- Capacity
- 10.5 MWPower Technology gives 10.5 MW; Global Energy Monitor gives 7.1 MWac.
- Technology
- Solar PVThin-film modules on car-park canopies over about 4,500 spaces
- Stage counted on this site
- OperatingAs published: “Commissioned in December 2012; currently active” (Power Technology)
- Commercial operation
- December 2012
- Owners and developers
- Saudi Aramco (owner)
- BELECTRIC (developer)
- Sun & Life (developer)
- Supplies
- Saudi Aramco's North Park offices
- Engineering and construction
- BELECTRIC, Sun & Life
- Arrangement
- Owned by the user
- Country
- Saudi Arabia
- Location
- Dhahran, Eastern ProvinceLocality and region only; plant coordinates are not published
Modelled output
Estimated annual generation
18
GWh a year
19.9%
Capacity factor
5.6% of the modelled output of this tracker’s operational solar projects.
- Fixed at the optimal tiltCounted here18 GWh19.9%1,741 kWh per kWp
- Single-axis tracker21 GWh23.3%2,039 kWh per kWp
Yield read at the centre of Dhahran, rounded to 0.1°. Mounting as the source describes it.
Annual kWh per kWp from PVGIS for crystalline silicon with 14% system loss, multiplied by the capacity as the source states it and taken as peak. A plant rated in MWac carries more DC capacity, so its estimate runs low.
Tracker totals, modelled
| Stage | Projects | Capacity, MW | GWh a year | Capacity factor |
|---|---|---|---|---|
| Operational | 6 / 7 | 173 | 329 | 21.7% |
| Contracted | 3 / 4 | 72 | 131 | 20.7% |
| Observed | 0 / 1 | 0 | 0 | — |
Solar yield: PVGIS 5.2 (PVGIS-SARAH2), European Commission, Joint Research Centre. © European Union. Estimate as JSON
Sources
Where each figure comes from
| Publisher | Publication | Published | Read on | Kind |
|---|---|---|---|---|
| Power Technology | Power plant profile: Saudi Aramco North Park Project, Saudi Arabia | 21 October 2024 | 24 September 2026 | Press or compiler |
| Global Energy Monitor | Dhahran Solar Car Park | Undated | 24 September 2026 | Press or compiler |
Where sources disagree
Both readings, and the one counted
Capacity
- 10.5 MW, commissioned December 2012 — Power Technology
- 7.1 MWac, start year 2023, owner Saudi Aramco Power — Global Energy Monitor
Counted on this site: 10.5 MW, owner Saudi Aramco
Why: The figure published at construction; Global Energy Monitor's AC figure and start year come from a satellite survey and are kept beside it.
Solar and wind resource
The resource at Dhahran
NASA POWER's long-run means for the 0.5° cell that holds the locality: an area-level picture, not a site measurement.
5.52 kWh/m²/day
Global horizontal irradiance
About 2,015 kWh/m² a year
3.94 kWh/m²/day
Direct normal irradiance
5.8 m/s
Wind at 50 m
27.2 °C
Air temperature
Warmest month August, 35.6 °C
Aerosol optical depth: 0.56 · Dustiest month July
| January | 3.74 |
|---|---|
| February | 4.46 |
| March | 5.34 |
| April | 5.94 |
| May | 6.84 |
| June | 7.34 |
| July | 7.00 |
| August | 6.70 |
| September | 6.16 |
| October | 5.16 |
| November | 3.94 |
| December | 3.52 |
Source: NASA Langley Research Center POWER Project, climatology 2001–2020, public domain; retrieved 2026-09-24. Cell N26.0E50.0, native resolution 1° (CERES SYN1deg). These data were obtained from the NASA Langley Research Center (LaRC) POWER Project funded through the NASA Earth Science/Applied Science Program.
Saudi captive and corporate solar, 24 September 2026 (2026-09)