Saudi Renewables Tracker · captive and corporate
Ma'aden Solar I (solar steam)
A 1,500 MWth industrial solar heat project at Ras Al Khair, Eastern Province. Stage: Announced.
The record
What the sources publish for this project
- Capacity
- 1,500 MWthThermal capacity; not added to any electrical total.
- Technology
- Solar heat for industryEnclosed-trough solar steam for the alumina refinery; heat, not electricity
- Stage counted on this site
- AnnouncedAs published: “Under development; a technology showcase is the first stage” (GlassPoint)
- Owners and developers
- GlassPoint (owner, developer)
- Supplies
- Ma'aden
- Operation and maintenance
- GlassPoint
- Arrangement
- Corporate power purchase agreement
- Country
- Saudi Arabia
- Location
- Ras Al Khair, Eastern ProvinceLocality and region only; plant coordinates are not published
GlassPoint builds, owns and operates the plant and sells the steam to Ma'aden (GlassPoint). No construction date for the full plant has been published.
Sources
Where each figure comes from
| Publisher | Publication | Published | Read on | Kind |
|---|---|---|---|---|
| GlassPoint | Ma'aden Solar I | Undated | 24 September 2026 | Procurer, developer or owner |
Solar and wind resource
The resource at Ras Al Khair
NASA POWER's long-run means for the 0.5° cell that holds the locality: an area-level picture, not a site measurement.
5.36 kWh/m²/day
Global horizontal irradiance
About 1,956 kWh/m² a year
3.94 kWh/m²/day
Direct normal irradiance
5.8 m/s
Wind at 50 m
26.5 °C
Air temperature
Warmest month August, 35.1 °C
Aerosol optical depth: 0.54 · Dustiest month April
| January | 3.50 |
|---|---|
| February | 4.22 |
| March | 5.16 |
| April | 5.72 |
| May | 6.66 |
| June | 7.26 |
| July | 6.98 |
| August | 6.70 |
| September | 6.04 |
| October | 4.94 |
| November | 3.68 |
| December | 3.26 |
Source: NASA Langley Research Center POWER Project, climatology 2001–2020, public domain; retrieved 2026-09-24. Cell N27.5E49.0, native resolution 1° (CERES SYN1deg). These data were obtained from the NASA Langley Research Center (LaRC) POWER Project funded through the NASA Earth Science/Applied Science Program.
Saudi captive and corporate solar, 24 September 2026 (2026-09)