AMAALA

AMAALA: 700 MWh of Energy storage, Awarded, in AMAALA.

What the source says

AMAALA

Battery of AMAALA's off-grid utility system, 700 MWh on the design basis the reports use, beside 250 MW of solar PV; full operation not verified.

Another source gives a different figure

  • EDF's 2025 registration document reports 770 MWh for the same system; the reports keep the 700 MWh design basis (Red Sea Global and Masdar) and do not add the two.
  • The report gives the utility's design and says full operation is not verified; the Saudi Renewables Tracker stages AMAALA's 250 MW of solar PV as under construction.

Renewable Vision report RV-SAU-SERIES03-20260912, page 1 · Renewable Vision report RV-SAU-RENEWABLES-GUIDE-20260912, page 1 · Renewable Vision report RV-SAU-RENEWABLES-GUIDE-20260912, page 12

Source: Saudi battery storage, as compiled on 27 September 2026.

Classification

This project on the site's facets

The same fields every project in the index carries. Not disclosed means the source publishes nothing for it; nothing is estimated.

Place
AMAALARolls up to: Tabuk · Saudi Arabia · GCC · MENA · Arab League
Sector
Energy storage
Technology
Battery storage
Stage
Awarded
  1. Announced
  2. Pre-feasibility
  3. Feasibility
  4. Front-end engineering design (FEED)
  5. Permitting
  6. Procurement
  7. Awarded
  8. Offtake signed
  9. Final investment decision
  10. Financial close
  11. Construction
  12. Commissioning
  13. Operational
  14. Expansion
  15. Decommissioned
In the source's words: contracted
On hold, delayed or cancelled
Not disclosed
Commitment
Contract (PPA, EPC or offtake)
  1. Reported
  2. Announced intent
  3. Memorandum or framework
  4. Joint development agreement or heads of agreement
  5. Contract (PPA, EPC or offtake)
  6. Final investment decision
  7. Financial close
Programme
Not disclosed
Investment
Not disclosed
Capacity
700 MWh
Annual output
Not disclosed
Tariff or levelised cost
Not disclosed
Emissions
Not disclosed

Milestones

Not disclosed

Companies and bodies

Where it comes from

Dataset
Saudi battery storage
Source type
Company release · The source publication
Verification
Conflicting sources
Last updated
27 September 2026