Skip to content
Renewable Vision

Saudi Renewables Tracker

Tabarjal solar PV project

A 400 MW solar PV project at Tubarjal, Al-Jawf, under construction according to the Principal Buyer register.

The record

What the tracker and the register hold for this project

Capacity
400 MWSaudi Renewables Tracker, KAPSARC snapshot 12 September 2026
Technology
Solar PV
Stage counted on this site
Under constructionTaken from the Principal Buyer register, checked 21 September 2026; the register leads where it and the tracker disagree
Stage in the Principal Buyer register
Under constructionListed as “Tabarjal”; Saudi Power Procurement Company, checked 21 September 2026
Stage as the tracker’s source publishes it
InstalledKAPSARC Renewable Energy Projects Dashboard, snapshot 12 September 2026 The Principal Buyer register records a different stage. This site counts the register’s stage, because the Principal Buyer contracts the power and signs off commercial operation; the tracker’s reading stays published here.
Completion year
2026As published; a year still ahead is a stated target
Procurement route
National Renewable Energy Program, round 4
Tender year
2022
Developers and published equity shares
Shares as the developers publish them; a company without a share has not published one
Grid
National grid project
Location
Tubarjal, Al-JawfLocality and region only; plant coordinates are not published
Levelised cost of electricity, as tendered
1.708 US cents per kWhAs published in the KAPSARC dashboard, snapshot 12 September 2026
Annual generation, modelled
840,960 MWh a yearModelled in the tracker as capacity × 8,760 hours × a 24% capacity factor. Not metered output.

KAPSARC, Renewable Energy Projects Dashboard (July 2026 project data, snapshot 12 September 2026); SPPC / Principal Buyer, Renewable project register (38 records checked 11 September 2026). Tracker edition 2026-Q3.

Projects you watch are listed on your account page.

What changed

Changes on record for this project

Each entry is a change a weekly sync observed in the Principal Buyer register or the tracker, with the value on both sides.

DateChangeBefore and afterSource
2026-09-12Added to the register (backfilled)— → 400 MWPrincipal Buyer register

The full change ledger

Location

Tubarjal, Al-Jawf

The tracker places this project at Tubarjal, in Al-Jawf. This site publishes locality and region only: plant coordinates are confidential and are not shown on this page, in its data or in its API.