A 500 MW onshore wind project at Waad Al Shamal, Northern Borders, under construction according to the Principal Buyer register.

The record

What the tracker and the register hold for this project

Capacity
500 MWSaudi Renewables Tracker, KAPSARC snapshot 12 September 2026
Technology
Onshore wind
Stage counted on this site
Under constructionTaken from the Principal Buyer register, checked 28 September 2026; the register leads where it and the tracker disagree
Stage in the Principal Buyer register
Under constructionListed as “Wad Al Shamal”; Saudi Power Procurement Company, checked 28 September 2026
Stage as the tracker’s source publishes it
InstalledKAPSARC Renewable Energy Projects Dashboard, snapshot 12 September 2026 The Principal Buyer register records a different stage. This site counts the register’s stage, because the Principal Buyer contracts the power and signs off commercial operation; the tracker’s reading stays published here.
Completion year
2026As published; a year still ahead is a stated target
Procurement route
National Renewable Energy Program, round 4
Tender year
2022
Developers and published equity shares
Shares as the developers publish them; a company without a share has not published one
Grid
National grid project
Location
Waad Al Shamal, Northern BordersLocality and region only; plant coordinates are not published
Levelised cost of electricity, as tendered
1.702 US cents per kWhAs published in the KAPSARC dashboard, snapshot 12 September 2026
Annual generation, modelled
1,752,000 MWh a yearModelled in the tracker as capacity × 8,760 hours × a 40% capacity factor. Not metered output.

KAPSARC, Renewable Energy Projects Dashboard (July 2026 project data, snapshot 12 September 2026); SPPC / Principal Buyer, Renewable project register (38 records checked 11 September 2026). Tracker edition 2026-Q3.

Projects you watch are listed on your account page.

What changed

Changes on record for this project

Each entry is a change a weekly sync observed in the Principal Buyer register or the tracker, with the value on both sides.

DateChangeBefore and afterSource
2026-09-12Added to the register (backfilled)— → 500 MWPrincipal Buyer register

The full change ledger

Location

Waad Al Shamal, Northern Borders

The tracker places this project at Waad Al Shamal, in Northern Borders. This site publishes locality and region only: plant coordinates are confidential and are not shown on this page, in its data or in its API.

Solar and wind resource

The resource at Northern Borders

NASA POWER's long-run means for the 0.5° cell that holds the locality: an area-level picture, not a site measurement.

5.90 kWh/m²/day

Global horizontal irradiance

About 2,154 kWh/m² a year

5.38 kWh/m²/day

Direct normal irradiance

5.4 m/s

Wind at 50 m

22.8 °C

Air temperature

Warmest month August, 34.6 °C

Aerosol optical depth: 0.42 · Dustiest month May

Global horizontal irradiance by month, kWh/m²/day
January: 3.74 kWh/m²/dayJanFebruary: 4.72 kWh/m²/dayFebMarch: 5.90 kWh/m²/dayMarApril: 6.78 kWh/m²/dayAprMay: 7.48 kWh/m²/dayMayJune: 8.20 kWh/m²/dayJunJuly: 7.98 kWh/m²/dayJulAugust: 7.38 kWh/m²/dayAugSeptember: 6.40 kWh/m²/daySepOctober: 5.00 kWh/m²/dayOctNovember: 3.88 kWh/m²/dayNovDecember: 3.42 kWh/m²/dayDec
January3.74
February4.72
March5.90
April6.78
May7.48
June8.20
July7.98
August7.38
September6.40
October5.00
November3.88
December3.42

Source: NASA Langley Research Center POWER Project, climatology 2001–2020, public domain; retrieved 2026-09-24. Cell N30.0E42.0, native resolution 1° (CERES SYN1deg). These data were obtained from the NASA Langley Research Center (LaRC) POWER Project funded through the NASA Earth Science/Applied Science Program.