What a home solar system costs in Saudi Arabia, and what it saves

Enter your bill and city to see the grid-connected rooftop system that fits, its rough cost, what it saves under SEC's tariff and how long it takes to pay back. Then, in plain words, the draft unified regulation for renewable energy for self-consumption that the Saudi Electricity Regulatory Authority published on 12 October 2026.

  • The draft Draft for public comment, not yet adopted

Work it out from your bill

Four fields, an answer at once. A first estimate to help you decide before a roof survey.

Meter type
Saves a year
⁦⃁ 4,450⁩about 36% of your bill
Pays back in
9.8 to 15.3 years
Rough cost
⁦⃁ 43,500⁩–⁦⃁ 68,000⁩
Makes a year
26,300kWh
Used in the building
19,000kWh
Sent to the grid
7,300kWh

Weak for now: more than 12 years on average. Cutting AC use saves faster.

  • Above 11 kW: the draft sets connection charges from SAR 700.
  • Needs about 95 m² of roof.

The report measures your roof, meter and load and gives you a figure to rely on.

Find an installer in Jeddah

See the Jeddah directory
How we worked it out
  • Sunshine for each city from NASA POWER, the 2001–2025 average.
  • We assume the system turns 80% of the sunshine into power after heat, dust and losses.
  • We assume 40% to 90% of the output is used in the building by day, less as the system grows.
  • Cost of SAR 3,000 to 4,700 per kW installed, from Saudi studies and installers.
  • Saudi Electricity's tariff in force on the day you calculate, with 15% VAT, and the export credit from the draft.
  • A first estimate; it does not replace a survey of the roof, meter and load.
  • Saudi Electricity's adjusted tariff applies from 1 January 2027 (se.com.sa, read 18 November 2026): higher rates and a fixed monthly charge by breaker size. The calculator switches to it on that day by itself; from then it takes the lowest breaker band's charge out of your bill, and that charge is not cut by solar. The new tariff and your bill
  • Typical retail prices of panels, inverters and batteries today (context only; the calculator's cost basis is not changed)

For context: a solar panel of 400 W or more sells online in Saudi Arabia for about 0.9 riyals per watt today (median of 15 retail offers, 18 November 2026). That is the panel alone; the rooftop calculator's installed cost covers the whole system and is not changed by it. See the price ranges

The draft

What is in the draft of 12 October 2026?

One regulation for small and large systems. Not adopted yet, and it may change after public comment.

Largest system
Up to 50 MW per premises, against 2 MW for small systems today.
Categories
Four, from 1 kW to 50 MW.
Connection charges
None for category 1 (up to 11 kW); SAR 700 to 35,000 for the larger categories.
Exported surplus
7 halalas per kWh for homes and 5 for others, as a credit on the bill.
Credit lifetime
12 months, then it lapses.
Batteries
Allowed up to the system's own capacity; more needs approval after a technical study.
Who installs
A contractor or consultant qualified by the Ministry of Energy's committee, for systems up to 2 MW.
Complaints
The service provider resolves them in 7 days; you can escalate to the authority.
Technologies
Solar, wind, waste-to-energy and biofuel.

In force today: small systems of 1 kW to 2 MW, no larger than the contracted load, on net billing with a two-way meter.

What it means for you

Save on what you use, not on what you sell

Homes

A kWh you use from your panels is worth 18 or 30 halalas; one you export, only 7. Size the system to your daytime load, not to sell to the grid.

Businesses

Commercial tariffs are 22 and 32 halalas and use is daytime, so the case is stronger. The draft raises the cap to 50 MW and allows storage.

Farms

Farm tariffs are 18 and 22 halalas. A farm on diesel compares with its price: SAR 1.79 a litre since January 2026.

The steps

From the idea to the two-way meter

  1. Check the case

    Work it out here, then get a study of your roof and meter.

  2. Choose a qualified contractor

    Only contractors and consultants qualified by the Ministry of Energy design, install and connect.

  3. Design and approvals

    A single-line diagram, a structural check of the roof, the municipality's approval and equipment from the approved list.

  4. Apply to connect

    The contractor files it on Saudi Electricity's portal for small systems.

  5. Install and inspect

    Installation takes a few days, then the utility inspects and fits the two-way meter.

  6. Switch on

    The surplus shows as a credit on your bill, valid for 12 months.

Some installers put the whole process at 30 to 60 days.

How we help

Before you sign with a contractor

We neither sell nor install panels. We work out the case impartially, compare the quotes and follow up with you until it runs.