Skip to content
عربي
← All reportsBuilt from the tracker when this page opened.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.

Gulf renewables at a glance

4 projects and 7.7 GW across the Gulf: 5.2 GW under construction against 108 MW operating.

Projects
4
Tracked capacity
7.7GW4 projects
Operating
108MW1 project
Under construction
5.2GW1 project

Capacity by country

  • United Arab Emirates7.7 GW4 projects

Where the projects are

Round-the-clock solar and storage project, Abu Dhabi · 5,200 MWMohammed bin Rashid Al Maktoum Solar Park, phase 7 · 2,000 MWWahat Al Zaweya BESS · 400 MWAbu Dhabi virtual battery plant (sodium-sulphur) · 108 MW
  • Operating
  • Under construction
  • Awarded, in tender or announced

Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.

Capacity by stage

  • Operating108 MW1 project
  • Under construction5.2 GW1 project
  • Awarded, in tender or announced2.4 GW2 projects

Capacity by technology

  • Solar photovoltaic7.2 GW2 projects
  • Battery storage508 MW2 projects

The ten largest projects

ProjectCapacityTechnologyStagePlace
Round-the-clock solar and storage project, Abu Dhabi5,200 MWSolar photovoltaicConstructionUnited Arab Emirates
Mohammed bin Rashid Al Maktoum Solar Park, phase 72,000 MWSolar photovoltaicProcurementUnited Arab Emirates
Wahat Al Zaweya BESS400 MWBattery storageAwardedUnited Arab Emirates
Abu Dhabi virtual battery plant (sodium-sulphur)108 MWBattery storageOperationalUnited Arab Emirates

Source: Renewable Vision, The GCC Renewables Tracker, records compiled 2026-09-29. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.