Skip to content
عربي
← All reportsBuilt from the tracker when this page opened.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.

Saudi renewables at a glance

5 projects and 6.1 GW tracked: 5.1 GW under construction against 0 MW operating.

Projects
5
Tracked capacity
6.1GW5 projects
Operating
0MW0 projects
Under construction
5.1GW4 projects

Capacity by stage

  • Under construction5.1 GW4 projects
  • Awarded, in tender or announced1.0 GW1 project

Where the projects are

Starah · 2,000 MWDwadmi · 1,500 MWShaqra · 1,000 MWBaeyda'a Nathel 1 · 1,000 MWAlghat · 600 MW
  • Under construction
  • Awarded, in tender or announced

Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.

Capacity by technology

  • Wind6.1 GW5 projects

Capacity by province

  • Riyadh6.1 GW5 projects

Commercial operation by year

600 MW2026
3.0 GW2027
1.5 GW2028
1.0 GW2029

Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.

The ten largest projects

ProjectCapacityTechnologyStagePlace
Starah2,000 MWWindConstructionRiyadh
Dwadmi1,500 MWWindConstructionRiyadh
Shaqra1,000 MWWindConstructionRiyadh
Baeyda'a Nathel 11,000 MWWindProcurementRiyadh
Alghat600 MWWindConstructionRiyadh

Source: Renewable Vision, The Saudi Renewables Tracker, records compiled 2026-09-28. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.