Supplier registration · EPC contractor
How to register as a supplier with China Energy Engineering Corporation (CEEC)
Where China Energy Engineering Corporation (CEEC / Energy China) registers suppliers, as we found it on 16 November 2026, and the Saudi solar, wind and storage projects it is on. Free to read.
EPC contractor
What it is on Saudi projects
4
Saudi projects in the pipeline
7,000
MW of solar and wind
—
MWh of battery storage
Supplier file, 16 November 2026
Where suppliers register
Where China Energy Engineering Corporation (CEEC / Energy China) registers suppliers
https://ec.ceec.net.cn/
- Page title
- 中国能源建设集团(股份)有限公司-电子采购平台首页 | 中国能建电子采购平台
- What it is
- A registration portal: the page where the company registers suppliers. The portal is in Chinese.
- Checked on
- 16 November 2026
Note from the check
Homepage carries a 供应商注册 (supplier registration) link; the platform warns of counterfeit copies, so check the domain.
What this page does not tell you: it says where China Energy Engineering Corporation (CEEC / Energy China) registers suppliers and which Saudi projects it is on. It does not replace the company's own requirements, which only the company sets and may change. Read them on its own page before you apply.
The full project lists and maps, free
Join free in one tap: download the project lists, open the maps and get an alert when a project moves.
Saudi projects
The Saudi projects China Energy Engineering Corporation (CEEC / Energy China) is on
Solar, wind and storage projects under construction, contracted or out to tender, from the site's trackers. Each links to its project page.
| Project | Technology | Capacity | Stage | Its role |
|---|---|---|---|---|
| Haden PV: 2000 MW | Solar | 2,000 MW | Under construction | EPC contractor |
| Khulis PV: 2000 MW | Solar | 2,000 MW | Under construction | EPC contractor |
| Starah Wind: 2000 MW | Wind | 2,000 MW | Under construction | EPC contractor |
| Shaqra Wind: 1000 MW | Wind | 1,000 MW | Under construction | EPC contractor |
Supplier file
Every project, every contractor, every source
For each Saudi pipeline project: the developers, the EPC contractor and suppliers, with the source, the date and the sentence quoted for each, and where all 35 companies register suppliers. One Excel workbook, in English or Arabic.
The supplier file
490paid once · 90 days of fresh downloads
Built from today’s data each time you download it, in English or Arabic. Paid with mada, Apple Pay or a card, with or without an account.