Water and desalination
Maps Saudi desalination and the water system around it: the large coastal plants, the smaller captive and institutional facilities, the project pipeline and replacement plants, published water-contract tariffs, and the conditions under which brine recovery becomes a product. The Saudi Water Authority's 2025 baseline for seawater desalination capacity is about 11.9 million m³/day, 7.442 public plus 4.446 private, and the accompanying register holds 123 records covering plants, phases, fleets and proposals, which the report states is not a count of operating plants. Figures are as compiled on 12 September 2026.

What the report covers
Saudi Arabia's water infrastructure deserves the same attention as its power infrastructure.
SWA's 2025 figures put seawater desalination capacity at approximately 11.9 million m³/day, combining public and private supply. Behind that number is a network of large coastal plants, smaller community systems, industrial utilities, university and airport facilities, and dedicated tourism projects.
This Renewable Vision guide maps that network and explores the connections between water, energy and industry:
• Major plants on the eastern and western coasts.
• Smaller and captive facilities that are often absent from national maps.
• Project pipelines, replacement plants and published water-contract tariffs.
• The role of pumping, water storage and power supply in system efficiency.
• Brine recovery: the chemistry and market conditions that determine whether a resource becomes a viable product.
The accompanying register separates plants from phases, operating facilities from proposals, and seawater desalination from inland water treatment. Unresolved entries are flagged; it is not presented as a census of every small licensed unit.
For planners, the practical question is how to coordinate production, energy, storage and delivery as one water system.
The PDF carries its own source page as well.
3 of 15 pages shown



Get the report
The PDF and the data files are free for members. Membership takes a minute: verify an email address or a mobile number once, and the download opens along with the dashboards and CSV export.
Figures are as filed on 12 September 2026; live dashboards may differ.