Skip to content
عربي

Electric mobility

The electric mobility shift

Connects the parts of the electric-mobility shift that move at different speeds: new-car sales, the fleet already on the road, public charging points and their power, manufacturing and battery deployment, and what rising EV demand asks of electricity planning, with a Saudi section on charging and automotive developments. Around one in four new cars sold worldwide in 2025 was electric, on the IEA's 2025 historical data; the dated 2026 updates draw on ACEA, SMMT, EVIQ, PIF, Lucid, CEER and DEWA, and announced targets are kept apart from current infrastructure. Figures are as compiled on 19 September 2026.

  • Compiled 19 September 2026
  • 12 pages
The electric mobility shift

What the report covers

The electric mobility shift is changing more than the car market.

Around one in four new cars sold worldwide was electric in 2025. But new-car sales, the existing fleet and public charging infrastructure are moving at different speeds.

This Renewable Vision report connects the pieces:

• Global adoption and emerging markets

• Public charging points, power and access

• Manufacturing and battery deployment

• Saudi Arabia’s charging and automotive developments

• What growing EV demand means for electricity planning

The global comparisons use the IEA’s 2025 historical data. Dated 2026 updates draw on ACEA, SMMT, EVIQ, PIF, Lucid, CEER and DEWA. Announced targets remain separate from current infrastructure.

For Saudi Arabia, the opportunity spans charging services, manufacturing and power-system planning. Their progress needs to be measured with the right units and boundaries.

Which deserves the most attention next: dependable public charging, home-charging access or local grid capacity?

Preview

3 of 12 pages shown

The electric mobility shift, page 1The electric mobility shift, page 2The electric mobility shift, page 3

Get the report

The electric mobility shift

Get the PDF free with membership

The PDF and the data files are free for members. Membership takes a minute: verify an email address or a mobile number once, and the download opens along with the dashboards and CSV export.

Create a free account and the download starts as soon as you are in. You come back to this report.

Not ready to join?

Weekly update

Saudi renewables, weekly: stage changes, tenders and commercial operation dates. One email on Sunday.

No password and no account. We email you a link to confirm, and every update has a one-click unsubscribe. Privacy policy

The name you use at work.

At least 8 characters. A short phrase you will remember works well.

By continuing with one of these accounts, you accept the terms of use, including the licence and the member terms, and the privacy policy.

We use your details to provide access and, if you opt in, to send you the weekly brief or the alerts you choose. Privacy policy

Figures are as filed on 19 September 2026; live dashboards may differ. Open the live dashboard