Skip to content
عربي

Hydrogen

Global hydrogen projects and MENA

Maps the global hydrogen project pipeline and then the MENA projects inside it, from NEOM and Yanbu to Oman, the UAE, Egypt and the North African projects. The IEA's June 2026 inventory holds 2,934 project-phase records, of which 391 are operational and 213 have reached final investment decision or construction; those are phases and pilots rather than distinct sites, and renewable-power capacity, electrolyser capacity and product output are kept as separate quantities. The regional profiles were reviewed on 19 September 2026, which does not move the date of the global snapshot.

  • Compiled 19 September 2026
  • 12 pages
Global hydrogen projects and MENA

What the report covers

The global hydrogen pipeline is large. Its projects are at very different stages.

The IEA's June 2026 inventory contains 2,934 project-phase records. Of these, 391 are operational and 213 have reached final investment decision or construction.

This Renewable Vision guide maps that global picture, then looks more closely at MENA:

- Saudi Arabia's NEOM and Yanbu developments

- Oman's industrial hydrogen use and export-oriented projects

- UAE demonstrations and Gulf ammonia developments

- Egypt's first operating phase and planned expansions

- Projects in Morocco, Mauritania, Tunisia and Algeria

Throughout the guide, renewable-power capacity, electrolyzer capacity and product output are kept separate. Operating plants, development agreements and project targets are labeled accordingly.

What the figures mean

Quoted from the report's own notes on scope and definitions, in the words it published them in.

  • Global counts use the IEA database released on 18 June 2026. Selected regional developer/government disclosures were reviewed on 19 September 2026. A current regional profile does not silently change the historical global snapshot.
  • 2,934 project-phase records include pilots, phases, cancelled entries and other stages. They are not 2,934 distinct industrial sites, nor a census of every conventional hydrogen plant.
  • 391 records are operational; 213 are FID/construction. The plotted subset is 295 and 197, respectively. All other records remain in the dataset and totals.
  • MENA here includes Mauritania and the country codes listed in the extraction script: 178 records, including 6 operational, 7 FID/construction, 138 concept/feasibility, 3 demonstration and 24 inactive records.
  • GW/MW of renewable generation and GW/MW of electrolysis are different quantities. Annual hydrogen, ammonia and methanol outputs also remain separate.
  • Developer production targets are not replaced with IEA normalized theoretical output. Values in the retained baseline preserve the IEA definitions.
  • 331 entries with explicitly random coordinates are excluded from point maps. Remaining IEA coordinates may still be approximate. Selected regional pins are named-area anchors, not plot boundaries; sites without verified locations are not given precise pins.
  • Stages are evidence labels, not assessments of eventual success. No announcement is treated as a completed plant or guaranteed delivery.

Preview

3 of 12 pages shown

Global hydrogen projects and MENA, page 1Global hydrogen projects and MENA, page 2Global hydrogen projects and MENA, page 3

Get the report

Global hydrogen projects and MENA

Get the PDF free with membership

The PDF and the data files are free for members. Membership takes a minute: verify an email address or a mobile number once, and the download opens along with the dashboards and CSV export.

Create a free account and the download starts as soon as you are in. You come back to this report.

Not ready to join?

Weekly update

Saudi renewables, weekly: stage changes, tenders and commercial operation dates. One email on Sunday.

No password and no account. We email you a link to confirm, and every update has a one-click unsubscribe. Privacy policy

The name you use at work.

At least 8 characters. A short phrase you will remember works well.

By continuing with one of these accounts, you accept the terms of use, including the licence and the member terms, and the privacy policy.

We use your details to provide access and, if you opt in, to send you the weekly brief or the alerts you choose. Privacy policy

Figures are as filed on 19 September 2026; live dashboards may differ. Open the live dashboard