Gulf renewables at a glance
43 projects and 32.3 GW across the Gulf: 10.7 GW under construction against 8.8 GW operating.
- Projects
- 43
- Tracked capacity
- 32.3GW43 projects
- Operating
- 8.8GW21 projects
- Under construction
- 10.7GW8 projects
Capacity by country
- United Arab Emirates19.0 GW15 projects
- Oman4.6 GW12 projects
- Special Economic Zone at Duqm3.2 GW2 projects
- Qatar2.8 GW2 projects
- Kuwait1.6 GW5 projects
- Ras Laffan Industrial City458 MW1 project
Where the projects are
- Operating
- Under construction
- Awarded, in tender or announced
Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.
Capacity by stage
- Operating8.8 GW21 projects
- Under construction10.7 GW8 projects
- Awarded, in tender or announced12.8 GW14 projects
Capacity by technology
- Solar photovoltaic32.3 GW43 projects
The ten largest projects
| Project | Capacity | Technology | Stage | Place |
|---|---|---|---|---|
| Round-the-clock solar and storage project, Abu Dhabi | 5,200 MW | Solar photovoltaic | Construction | United Arab Emirates |
| Continuous Renewable Energy Project (Mahout and Duqm) | 2,700 MW | Solar photovoltaic | Awarded | Special Economic Zone at Duqm |
| Mohammed bin Rashid Al Maktoum Solar Park, phase 7 | 2,000 MW | Solar photovoltaic | Procurement | United Arab Emirates |
| Dukhan Solar PV | 2,000 MW | Solar photovoltaic | Awarded | Qatar |
| Mohammed bin Rashid Al Maktoum Solar Park, phase 6 | 1,800 MW | Solar photovoltaic | Construction | United Arab Emirates |
| Al Dhafra Solar PV | 1,500 MW | Solar photovoltaic | Operational | United Arab Emirates |
| Al Ajban Solar PV | 1,500 MW | Solar photovoltaic | Construction | United Arab Emirates |
| Khazna Solar PV | 1,500 MW | Solar photovoltaic | Construction | United Arab Emirates |
| Zarraf Solar PV | 1,500 MW | Solar photovoltaic | Procurement | United Arab Emirates |
| Al Dibdibah Power and Al Shagaya Renewable Energy, phase III zone 1 | 1,100 MW | Solar photovoltaic | Procurement | Kuwait |