Saudi renewables: developers and prices
7 developers are named in the tracker. The lowest published price is 1.24 US¢/kWh and the median 1.48 US¢/kWh.
- Developers named
- 7
- Lowest published price
- 1.24US¢/kWhSudair
- Median published price
- 1.48US¢/kWh7 projects
- Largest project
- 2.0GWAfif 2
Developers by the capacity they hold
- ACWA Power6.7 GW5 projects
- Badeel6.6 GW4 projects
- Saudi Aramco Power5.5 GW3 projects
- Jinko Power300 MW1 project
- Altaaqa112 MW1 project
- TotalEnergies112 MW1 project
- Toyota Tsusho112 MW1 project
Each developer is credited with the whole capacity of every project it is named on, so joint projects count for each partner and the bars do not add to the total.
The lowest published pricesUS¢/kWh
7 projects carry a published price: lowest 1.24, median 1.48, highest 2.98 US¢/kWh.
- Sudair1.24*
- Afif 21.26*
- Afif 11.27*
- Saad 11.48*
- Saad 21.79*
- Wadi Aldawaser1.87*
- Layla2.98*
* LCOE. A price is a tariff or a levelised cost of electricity (LCOE) as its source states it, not a delivered electricity price.
Projects by price
| Project | Capacity | Developers | US¢/kWh | Operation |
|---|---|---|---|---|
| Sudair | 1,500 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.24* | 2023 |
| Afif 2 | 2,000 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.26* | 2027 |
| Afif 1 | 2,000 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.27* | 2027 |
| Saad 1 | 300 MW | Jinko Power | 1.48* | 2024 |
| Saad 2 | 1,125 MW | ACWA Power, Badeel | 1.79* | 2025 |
| Wadi Aldawaser | 112 MW | TotalEnergies, Toyota Tsusho, Altaaqa | 1.87* | 2025 |
| Layla | 91 MW | ACWA Power | 2.98* | 2024 |
* LCOE. A price is a tariff or a levelised cost of electricity (LCOE) as its source states it, not a delivered electricity price.