Saudi renewables: developers and prices
27 developers are named in the tracker. The lowest published price is 1.04 US¢/kWh and the median 1.60 US¢/kWh.
- Developers named
- 27
- Lowest published price
- 1.04US¢/kWhShuaibah 1
- Median published price
- 1.60US¢/kWh38 projects
- Largest project
- 3.9GWNGHC
Developers by the capacity they hold
- ACWA Power34.5 GW21 projects
- Badeel29.9 GW17 projects
- Saudi Aramco Power26.1 GW15 projects
- Masdar6.1 GW7 projects
- EDF Renewables4.1 GW7 projects
- Air Products3.9 GW1 project
- NEOM3.9 GW1 project
- KEPCO3.5 GW2 projects
- Nesma Renewables3.3 GW4 projects
- SPIC2.4 GW4 projects
Each developer is credited with the whole capacity of every project it is named on, so joint projects count for each partner and the bars do not add to the total.
The lowest published pricesUS¢/kWh
38 projects carry a published price: lowest 1.04, median 1.60, highest 2.98 US¢/kWh.
- Shuaibah 11.04*
- Najran1.09*
- Sudair1.24*
- Afif 21.26*
- Afif 11.27*
- Bisha1.29*
- As Sdawi1.29*
- Al Humaij1.31*
- Dwadmi1.33*
- Al Masa'a1.36*
- Al Darb1.36*
- Khulis1.36*
* LCOE. A price is a tariff or a levelised cost of electricity (LCOE) as its source states it, not a delivered electricity price.
Projects by price
| Project | Capacity | Developers | US¢/kWh | Operation |
|---|---|---|---|---|
| Shuaibah 1 | 600 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.04* | 2024 |
| Najran | 1,400 MW | Masdar | 1.09* | 2028 |
| Sudair | 1,500 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.24* | 2023 |
| Afif 2 | 2,000 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.26* | 2027 |
| Afif 1 | 2,000 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.27* | 2027 |
| Bisha | 3,000 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.29* | 2027 |
| As Sdawi | 2,000 MW | Masdar, KEPCO, GD Power | 1.29* | 2027 |
| Al Humaij | 3,000 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.31* | 2027 |
| Dwadmi | 1,500 MW | KEPCO, Etihad Water and Electricity, Nesma Renewables | 1.33* | 2028 |
| Al Masa'a | 1,000 MW | EDF Renewables, SPIC, Saudi Aramco Power | 1.36* | 2027 |
| Al Darb | 600 MW | Masdar | 1.36* | 2027 |
| Khulis | 2,000 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.36* | 2027 |
* LCOE. A price is a tariff or a levelised cost of electricity (LCOE) as its source states it, not a delivered electricity price.