Saudi renewables: developers and prices
9 developers are named in the tracker. The lowest published price is 1.04 US¢/kWh and the median 1.61 US¢/kWh.
- Developers named
- 9
- Lowest published price
- 1.04US¢/kWhShuaibah 1
- Median published price
- 1.61US¢/kWh8 projects
- Largest project
- 3.0GWAl-Leeth
Developers by the capacity they hold
- ACWA Power8.7 GW5 projects
- Badeel8.7 GW5 projects
- Saudi Aramco Power8.7 GW5 projects
- Al Jomaih600 MW2 projects
- EDF Renewables300 MW1 project
- Marubeni300 MW1 project
- Masdar300 MW1 project
- Nesma Renewables300 MW1 project
- TotalEnergies300 MW1 project
Each developer is credited with the whole capacity of every project it is named on, so joint projects count for each partner and the bars do not add to the total.
The lowest published pricesUS¢/kWh
8 projects carry a published price: lowest 1.04, median 1.61, highest 1.79 US¢/kWh.
- Shuaibah 11.04*
- Khulis1.36*
- Haden1.59*
- Muwayh1.61*
- Jeddah1.62*
- Rabigh 11.70*
- Rabigh 21.78*
- Shuaibah 21.79*
* LCOE. A price is a tariff or a levelised cost of electricity (LCOE) as its source states it, not a delivered electricity price.
Projects by price
| Project | Capacity | Developers | US¢/kWh | Operation |
|---|---|---|---|---|
| Shuaibah 1 | 600 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.04* | 2024 |
| Khulis | 2,000 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.36* | 2027 |
| Haden | 2,000 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.59* | 2026 |
| Muwayh | 2,000 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.61* | 2026 |
| Jeddah | 300 MW | Masdar, EDF Renewables, Nesma Renewables | 1.62* | 2023 |
| Rabigh 1 | 300 MW | Marubeni, Al Jomaih | 1.70* | 2023 |
| Rabigh 2 | 300 MW | Al Jomaih, TotalEnergies | 1.78* | 2026 |
| Shuaibah 2 | 2,060 MW | ACWA Power, Badeel, Saudi Aramco Power | 1.79* | 2024 |
* LCOE. A price is a tariff or a levelised cost of electricity (LCOE) as its source states it, not a delivered electricity price.