Saudi renewables: developers and prices

9 developers are named in the tracker. The lowest published price is 1.04 US¢/kWh and the median 1.61 US¢/kWh.

Developers named
9
Lowest published price
1.04US¢/kWhShuaibah 1
Median published price
1.61US¢/kWh8 projects
Largest project
3.0GWAl-Leeth

Developers by the capacity they hold

  • ACWA Power8.7 GW5 projects
  • Badeel8.7 GW5 projects
  • Saudi Aramco Power8.7 GW5 projects
  • Al Jomaih600 MW2 projects
  • EDF Renewables300 MW1 project
  • Marubeni300 MW1 project
  • Masdar300 MW1 project
  • Nesma Renewables300 MW1 project
  • TotalEnergies300 MW1 project

Each developer is credited with the whole capacity of every project it is named on, so joint projects count for each partner and the bars do not add to the total.

The lowest published pricesUS¢/kWh

8 projects carry a published price: lowest 1.04, median 1.61, highest 1.79 US¢/kWh.

  • Shuaibah 11.04*
  • Khulis1.36*
  • Haden1.59*
  • Muwayh1.61*
  • Jeddah1.62*
  • Rabigh 11.70*
  • Rabigh 21.78*
  • Shuaibah 21.79*

* LCOE. A price is a tariff or a levelised cost of electricity (LCOE) as its source states it, not a delivered electricity price.

Projects by price

ProjectCapacityDevelopersUS¢/kWhOperation
Shuaibah 1600 MWACWA Power, Badeel, Saudi Aramco Power1.04*2024
Khulis2,000 MWACWA Power, Badeel, Saudi Aramco Power1.36*2027
Haden2,000 MWACWA Power, Badeel, Saudi Aramco Power1.59*2026
Muwayh2,000 MWACWA Power, Badeel, Saudi Aramco Power1.61*2026
Jeddah300 MWMasdar, EDF Renewables, Nesma Renewables1.62*2023
Rabigh 1300 MWMarubeni, Al Jomaih1.70*2023
Rabigh 2300 MWAl Jomaih, TotalEnergies1.78*2026
Shuaibah 22,060 MWACWA Power, Badeel, Saudi Aramco Power1.79*2024

* LCOE. A price is a tariff or a levelised cost of electricity (LCOE) as its source states it, not a delivered electricity price.

Source: Renewable Vision, The Saudi Renewables Tracker, records compiled 2026-09-28. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.