Skip to content
عربي
← All reportsBuilt from the tracker when this page opened.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.

Saudi renewables at a glance

1 projects and 800 MW tracked: 0 MW under construction against 0 MW operating.

Projects
1
Tracked capacity
800MW1 project
Operating
0MW0 projects
Under construction
0MW0 projects

Capacity by stage

  • Awarded, in tender or announced800 MW1 project

Where the projects are

Samha · 800 MW
  • Awarded, in tender or announced

Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.

Capacity by technology

  • Wind800 MW1 project

Capacity by province

  • Al-Qassim800 MW1 project

Commercial operation by year

800 MW2029

Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.

The ten largest projects

ProjectCapacityTechnologyStagePlace
Samha800 MWWindProcurementAl-Qassim

Source: Renewable Vision, The Saudi Renewables Tracker, records compiled 2026-09-12. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.