Saudi renewables at a glance
1 projects and 800 MW tracked: 0 MW under construction against 0 MW operating.
- Projects
- 1
- Tracked capacity
- 800MW1 project
- Operating
- 0MW0 projects
- Under construction
- 0MW0 projects
Capacity by stage
- Awarded, in tender or announced800 MW1 project
Where the projects are
- Awarded, in tender or announced
Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.
Capacity by technology
- Wind800 MW1 project
Capacity by province
- Al-Qassim800 MW1 project
Commercial operation by year
800 MW2029
Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.
The ten largest projects
| Project | Capacity | Technology | Stage | Place |
|---|---|---|---|---|
| Samha | 800 MW | Wind | Procurement | Al-Qassim |