Saudi renewables at a glance
5 projects and 5.5 GW tracked: 0 MW under construction against 4.2 GW operating.
- Projects
- 5
- Tracked capacity
- 5.5GW5 projects
- Operating
- 4.2GW3 projects
- Under construction
- 0MW0 projects
Capacity by stage
- Operating4.2 GW3 projects
- Awarded, in tender or announced1.3 GW2 projects
Where the projects are
- Operating
- Awarded, in tender or announced
Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.
Capacity by technology
- Solar photovoltaic4.7 GW4 projects
- Wind800 MW1 project
Capacity by province
- Al-Qassim5.5 GW5 projects
Commercial operation by year
700 MW2024
2.0 GW2025
1.5 GW2026
1.3 GW2029
Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.
The ten largest projects
| Project | Capacity | Technology | Stage | Place |
|---|---|---|---|---|
| Ar Rass 2 | 2,000 MW | Solar photovoltaic | Operational | Al-Qassim |
| Khushaybi | 1,500 MW | Solar photovoltaic | Operational | Al-Qassim |
| Samha | 800 MW | Wind | Procurement | Al-Qassim |
| Ar Rass 1 | 700 MW | Solar photovoltaic | Operational | Al-Qassim |
| Khushaybi 2 | 500 MW | Solar photovoltaic | Procurement | Al-Qassim |