Skip to content
عربي
← All reportsBuilt from the tracker when this page opened.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.

Saudi renewables at a glance

8 projects and 9.4 GW tracked: 4.1 GW under construction against 1.1 GW operating.

Projects
8
Tracked capacity
9.4GW8 projects
Operating
1.1GW1 project
Under construction
4.1GW3 projects

Capacity by stage

  • Operating1.1 GW1 project
  • Under construction4.1 GW3 projects
  • Awarded, in tender or announced4.2 GW4 projects

Where the projects are

Al Humaij · 3,000 MWHenakiyah 3 · 1,500 MWBilghah · 1,300 MWHenakiyah 1 · 1,100 MWShegran · 900 MWYunbu · 700 MWSouth Ola · 500 MWHenakiyah 2 · 400 MW
  • Operating
  • Under construction
  • Awarded, in tender or announced

Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.

Capacity by technology

  • Solar photovoltaic6.5 GW5 projects
  • Wind2.9 GW3 projects

Capacity by province

  • Madinah9.4 GW8 projects

Commercial operation by year

1.1 GW2025
400 MW2026
3.7 GW2027
4.2 GW2029

Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.

The ten largest projects

ProjectCapacityTechnologyStagePlace
Al Humaij3,000 MWSolar photovoltaicConstructionMadinah
Henakiyah 31,500 MWSolar photovoltaicProcurementMadinah
Bilghah1,300 MWWindProcurementMadinah
Henakiyah 11,100 MWSolar photovoltaicOperationalMadinah
Shegran900 MWWindProcurementMadinah
Yunbu700 MWWindConstructionMadinah
South Ola500 MWSolar photovoltaicProcurementMadinah
Henakiyah 2400 MWSolar photovoltaicConstructionMadinah

Source: Renewable Vision, The Saudi Renewables Tracker, records compiled 2026-09-28. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.