Saudi renewables at a glance
4 projects and 2.5 GW tracked: 400 MW under construction against 700 MW operating.
- Projects
- 4
- Tracked capacity
- 2.5GW4 projects
- Operating
- 700MW2 projects
- Under construction
- 400MW1 project
Capacity by stage
- Operating700 MW2 projects
- Under construction400 MW1 project
- Awarded, in tender or announced1.4 GW1 project
Where the projects are
- Operating
- Under construction
- Awarded, in tender or announced
Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.
Capacity by technology
- Solar photovoltaic2.1 GW3 projects
- Wind400 MW1 project
Capacity by province
- Al-Jawf2.5 GW4 projects
Commercial operation by year
300 MW2020
400 MW2022
400 MW2026
1.4 GW2029
Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.
The ten largest projects
| Project | Capacity | Technology | Stage | Place |
|---|---|---|---|---|
| Tabarjal 2 | 1,400 MW | Solar photovoltaic | Procurement | Al-Jawf |
| Dumat Al-Jandal | 400 MW | Wind | Operational | Al-Jawf |
| Tabarjal | 400 MW | Solar photovoltaic | Construction | Al-Jawf |
| Sakaka | 300 MW | Solar photovoltaic | Operational | Al-Jawf |