Skip to content
عربي
← All reportsBuilt from the tracker when this page opened.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.

Saudi renewables at a glance

4 projects and 3.4 GW tracked: 1.4 GW under construction against 1.4 GW operating.

Projects
4
Tracked capacity
3.4GW4 projects
Operating
1.4GW1 project
Under construction
1.4GW2 projects

Capacity by stage

  • Operating1.4 GW1 project
  • Under construction1.4 GW2 projects
  • Awarded, in tender or announced600 MW1 project

Where the projects are

Kahfah · 1,425 MWAl Masa'a · 1,000 MWMawqaq · 600 MWSufun · 400 MW
  • Operating
  • Under construction
  • Awarded, in tender or announced

Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.

Capacity by technology

  • Solar photovoltaic3.4 GW4 projects

Capacity by province

  • Hail3.4 GW4 projects

Commercial operation by year

1.4 GW2025
1.4 GW2027
600 MW2029

Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.

The ten largest projects

ProjectCapacityTechnologyStagePlace
Kahfah1,425 MWSolar photovoltaicOperationalHail
Al Masa'a1,000 MWSolar photovoltaicConstructionHail
Mawqaq600 MWSolar photovoltaicProcurementHail
Sufun400 MWSolar photovoltaicConstructionHail

Source: Renewable Vision, The Saudi Renewables Tracker, records compiled 2026-09-28. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.