Skip to content
عربي
← All reportsBuilt from the tracker when this page opened.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.

Saudi renewables at a glance

44 projects and 53.0 GW tracked: 23.4 GW under construction against 13.8 GW operating.

Projects
44
Tracked capacity
53.0GW44 projects
Operating
13.8GW16 projects
Under construction
23.4GW17 projects

Capacity by stage

  • Operating13.8 GW16 projects
  • Under construction23.4 GW17 projects
  • Awarded, in tender or announced15.9 GW11 projects

Where the projects are

Al Humaij · 3,000 MWBisha · 3,000 MWAs Sdawi 2 · 3,000 MWAl-Leeth · 3,000 MWShuaibah 2 · 2,060 MWAfif 2 · 2,000 MWAr Rass 2 · 2,000 MWHaden · 2,000 MWMuwayh 2 · 2,000 MWAs Sdawi · 2,000 MWKhulis · 2,000 MWMuwayh · 2,000 MWAfif 1 · 2,000 MWHaden 2 · 2,000 MWKhushaybi · 1,500 MWSudair · 1,500 MWHenakiyah 3 · 1,500 MWKahfah · 1,425 MWTabarjal 2 · 1,400 MWNajran · 1,400 MWSaad 2 · 1,125 MWHenakiyah 1 · 1,100 MWAl Masa'a · 1,000 MWShiqri · 800 MWAr Rass 1 · 700 MWAl Darb · 600 MWShuaibah 1 · 600 MWTathleeth · 600 MWMawqaq · 600 MWSamtah · 600 MWSouth Ola · 500 MWKhushaybi 2 · 500 MWHenakiyah 2 · 400 MWSufun · 400 MWTabarjal · 400 MWRed Sea Project · 340 MWJeddah · 300 MWSaad 1 · 300 MWSakaka · 300 MWRabigh 1 · 300 MWRabigh 2 · 300 MWAmaala · 250 MWWadi Aldawaser · 112 MWLayla · 91 MW
  • Operating
  • Under construction
  • Awarded, in tender or announced

Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.

Capacity by technology

  • Solar photovoltaic53.0 GW44 projects

Capacity by province

  • Makkah16.6 GW11 projects
  • Riyadh7.1 GW7 projects
  • Madinah6.5 GW5 projects
  • Eastern Province5.0 GW2 projects
  • Al-Qassim4.7 GW4 projects
  • Aseer3.6 GW2 projects
  • Hail3.4 GW4 projects
  • Al-Jawf2.1 GW3 projects

Commercial operation by year

300 MW2020
2.1 GW2023
3.8 GW2024
5.8 GW2025
6.9 GW2026
16.6 GW2027
1.4 GW2028
15.1 GW2029

Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.

The ten largest projects

ProjectCapacityTechnologyStagePlace
Al Humaij3,000 MWSolar photovoltaicConstructionMadinah
Bisha3,000 MWSolar photovoltaicConstructionAseer
As Sdawi 23,000 MWSolar photovoltaicProcurementEastern Province
Al-Leeth3,000 MWSolar photovoltaicProcurementMakkah
Shuaibah 22,060 MWSolar photovoltaicOperationalMakkah
Afif 22,000 MWSolar photovoltaicConstructionRiyadh
Ar Rass 22,000 MWSolar photovoltaicOperationalAl-Qassim
Haden2,000 MWSolar photovoltaicConstructionMakkah
Muwayh 22,000 MWSolar photovoltaicProcurementMakkah
As Sdawi2,000 MWSolar photovoltaicConstructionEastern Province

Source: Renewable Vision, The Saudi Renewables Tracker, records compiled 2026-09-28. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.