Skip to content
عربي
← All reportsBuilt from the tracker when this page opened.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.

Saudi renewables at a glance

1 projects and 3.9 GW tracked: 3.9 GW under construction against 0 MW operating.

Projects
1
Tracked capacity
3.9GW1 project
Operating
0MW0 projects
Under construction
3.9GW1 project

Capacity by stage

  • Under construction3.9 GW1 project

Where the projects are

NGHC · 3,900 MW
  • Under construction

Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.

Capacity by technology

  • Hybrid solar and wind plants3.9 GW1 project

Capacity by province

  • NEOM3.9 GW1 project

Commercial operation by year

3.9 GW2027

Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.

The ten largest projects

ProjectCapacityTechnologyStagePlace
NGHC3,900 MWHybrid solar and wind plantsConstructionNEOM

Source: Renewable Vision, The Saudi Renewables Tracker, records compiled 2026-09-12. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.