Skip to content
عربي
← All reportsBuilt from the tracker when this page opened.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.

Saudi renewables at a glance

3 projects and 2.9 GW tracked: 700 MW under construction against 0 MW operating.

Projects
3
Tracked capacity
2.9GW3 projects
Operating
0MW0 projects
Under construction
700MW1 project

Capacity by stage

  • Under construction700 MW1 project
  • Awarded, in tender or announced2.2 GW2 projects

Where the projects are

Bilghah · 1,300 MWShegran · 900 MWYunbu · 700 MW
  • Under construction
  • Awarded, in tender or announced

Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.

Capacity by technology

  • Wind2.9 GW3 projects

Capacity by province

  • Madinah2.9 GW3 projects

Commercial operation by year

700 MW2027
2.2 GW2029

Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.

The ten largest projects

ProjectCapacityTechnologyStagePlace
Bilghah1,300 MWWindProcurementMadinah
Shegran900 MWWindProcurementMadinah
Yunbu700 MWWindConstructionMadinah

Source: Renewable Vision, The Saudi Renewables Tracker, records compiled 2026-09-12. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.