Skip to content
عربي
← All reportsBuilt from the tracker when this page opened.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.

Saudi renewables at a glance

7 projects and 7.1 GW tracked: 4.0 GW under construction against 3.1 GW operating.

Projects
7
Tracked capacity
7.1GW7 projects
Operating
3.1GW5 projects
Under construction
4.0GW2 projects

Capacity by stage

  • Operating3.1 GW5 projects
  • Under construction4.0 GW2 projects

Where the projects are

Afif 2 · 2,000 MWAfif 1 · 2,000 MWSudair · 1,500 MWSaad 2 · 1,125 MWSaad 1 · 300 MWWadi Aldawaser · 112 MWLayla · 91 MW
  • Operating
  • Under construction

Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.

Capacity by technology

  • Solar photovoltaic7.1 GW7 projects

Capacity by province

  • Riyadh7.1 GW7 projects

Commercial operation by year

1.5 GW2023
391 MW2024
1.2 GW2025
4.0 GW2027

Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.

The ten largest projects

ProjectCapacityTechnologyStagePlace
Afif 22,000 MWSolar photovoltaicConstructionRiyadh
Afif 12,000 MWSolar photovoltaicConstructionRiyadh
Sudair1,500 MWSolar photovoltaicOperationalRiyadh
Saad 21,125 MWSolar photovoltaicOperationalRiyadh
Saad 1300 MWSolar photovoltaicOperationalRiyadh
Wadi Aldawaser112 MWSolar photovoltaicOperationalRiyadh
Layla91 MWSolar photovoltaicOperationalRiyadh

Source: Renewable Vision, The Saudi Renewables Tracker, records compiled 2026-09-28. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.