Skip to content
عربي

Supplier registration · Developer

How to register as a supplier with Masdar

Where Masdar registers suppliers, as we found it on 16 November 2026, and the Saudi solar, wind and storage projects it is on. Free to read.

  • Developer

    What it is on Saudi projects

  • 5

    Saudi projects in the pipeline

  • 4,250

    MW of solar and wind

  • 700

    MWh of battery storage

Supplier file, 16 November 2026 · Its company page: projects and shares

Where suppliers register

Where Masdar registers suppliers

Open the page

https://masdar.ae/en/contact-us

Page title
Masdar | Contact Us
What it is
A contact page only: no supplier registration was found, so this is the company's general contact page.
Checked on
16 November 2026

Note from the check

No supplier page on masdar.ae; the contact form offers only General Inquiries, Media and Complaints.

What this page does not tell you: it says where Masdar registers suppliers and which Saudi projects it is on. It does not replace the company's own requirements, which only the company sets and may change. Read them on its own page before you apply.

The full project lists and maps, free

Join free in one tap: download the project lists, open the maps and get an alert when a project moves.

Join with emailSign in

Saudi projects

The Saudi projects Masdar is on

Solar, wind and storage projects under construction, contracted or out to tender, from the site's trackers. Each links to its project page.

ProjectTechnologyCapacityStageIts role
As Sdawi PV: 2000 MWSolar2,000 MWUnder constructionDeveloper
Al Darb PV: 600 MWSolar600 MWUnder constructionDeveloper
Najran PV: 1400 MWSolar1,400 MWUnder constructionDeveloper
Amaala PV: 250 MWSolar250 MWUnder constructionDeveloper
AMAALABattery storage700 MWhContractedDeveloper

Who is building

Contractors and suppliers named on its projects

Named in public sources on the projects Masdar develops or buys from. The source for each, its date and the sentence quoted are in the supplier file.

CompanyRoleProjectsSources
Shanghai Electric · Where it registersEPC contractor11

Supplier file

Every project, every contractor, every source

For each Saudi pipeline project: the developers, the EPC contractor and suppliers, with the source, the date and the sentence quoted for each, and where all 35 companies register suppliers. One Excel workbook, in English or Arabic.

What is in the file

The supplier file

⁦⃁ 490⁩paid once · 90 days of fresh downloads

Built from today’s data each time you download it, in English or Arabic. Paid with mada, Apple Pay or a card, with or without an account.