Supplier registration · Developer
How to register as a supplier with Saudi Aramco Power Company (SAPCO)
Where Saudi Aramco Power Company (SAPCO) registers suppliers, as we found it on 16 November 2026, and the Saudi solar, wind and storage projects it is on. Free to read.
Developer
What it is on Saudi projects
11
Saudi projects in the pipeline
20,400
MW of solar and wind
—
MWh of battery storage
Supplier file, 16 November 2026 · Its company page: projects and shares
Where suppliers register
Where Saudi Aramco Power Company (SAPCO) registers suppliers
https://www.aramco.com/en/what-we-do/suppliers/become-a-supplier
- Page title
- Become a supplier | Aramco
- What it is
- A registration portal: the page where the company registers suppliers.
- Checked on
- 16 November 2026
Note from the check
This is the parent Aramco's supplier registration page. No SAPCO-specific page was found.
What this page does not tell you: it says where Saudi Aramco Power Company (SAPCO) registers suppliers and which Saudi projects it is on. It does not replace the company's own requirements, which only the company sets and may change. Read them on its own page before you apply.
The full project lists and maps, free
Join free in one tap: download the project lists, open the maps and get an alert when a project moves.
Saudi projects
The Saudi projects Saudi Aramco Power Company (SAPCO) is on
Solar, wind and storage projects under construction, contracted or out to tender, from the site's trackers. Each links to its project page.
| Project | Technology | Capacity | Stage | Its role |
|---|---|---|---|---|
| Haden PV: 2000 MW | Solar | 2,000 MW | Under construction | Developer |
| Muwayh PV: 2000 MW | Solar | 2,000 MW | Under construction | Developer |
| Henakiyah 2 PV: 400 MW | Solar | 400 MW | Under construction | Developer |
| Al Humaij PV: 3000 MW | Solar | 3,000 MW | Under construction | Developer |
| Bisha PV: 3000 MW | Solar | 3,000 MW | Under construction | Developer |
| Afif 1 PV: 2000 MW | Solar | 2,000 MW | Under construction | Developer |
| Afif 2 PV: 2000 MW | Solar | 2,000 MW | Under construction | Developer |
| Khulis PV: 2000 MW | Solar | 2,000 MW | Under construction | Developer |
| Starah Wind: 2000 MW | Wind | 2,000 MW | Under construction | Developer |
| Al Masa'a PV: 1000 MW | Solar | 1,000 MW | Under construction | Developer |
| Shaqra Wind: 1000 MW | Wind | 1,000 MW | Under construction | Developer |
Who is building
Contractors and suppliers named on its projects
Named in public sources on the projects Saudi Aramco Power Company (SAPCO) develops or buys from. The source for each, its date and the sentence quoted are in the supplier file.
| Company | Role | Projects | Sources |
|---|---|---|---|
| China Energy Engineering Corporation (CEEC) · Where it registers | EPC contractor | 4 | 6 |
| Larsen & Toubro (L&T) · Where it registers | EPC contractor | 2 | 2 |
| Power Construction Corporation of China (PowerChina) · Where it registers | EPC contractor | 2 | 2 |
| PowerChina Huadong Engineering · Where it registers | EPC contractor | 2 | 4 |
| Arctech | Trackers | 3 | 3 |
| GameChange Solar | Trackers | 2 | 2 |
| Goldwind | Wind turbines | 2 | 2 |
| Sineng Electric | Inverters | 2 | 2 |
| JinkoSolar | Solar modules | 1 | 1 |
| Nextpower Arabia | Trackers | 1 | 1 |
Supplier file
Every project, every contractor, every source
For each Saudi pipeline project: the developers, the EPC contractor and suppliers, with the source, the date and the sentence quoted for each, and where all 35 companies register suppliers. One Excel workbook, in English or Arabic.
The supplier file
490paid once · 90 days of fresh downloads
Built from today’s data each time you download it, in English or Arabic. Paid with mada, Apple Pay or a card, with or without an account.