Saudi renewables: what comes next
2 projects are yet to operate, 1.2 GW in all: 1.2 GW under construction and 0 MW awarded, in tender or announced.
- Projects
- 2
- Tracked capacity
- 1.2GW2 projects
- Under construction
- 1.2GW2 projects
- Awarded, in tender or announced
- 0MW0 projects
Capacity due by year of operation
1.2 GW2027
Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.
Where it is being built
- Under construction
Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.
Capacity to come by province
- Jazan1.2 GW2 projects
Projects by year of operation
| Project | Capacity | Technology | Stage | Operation |
|---|---|---|---|---|
| Al Darb | 600 MW | Solar photovoltaic | Construction | 2027 |
| Samtah | 600 MW | Solar photovoltaic | Construction | 2027 |