Skip to content
عربي
← All reportsBuilt from the tracker when this page opened.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.

Saudi renewables: what comes next

28 projects are yet to operate, 39.3 GW in all: 23.4 GW under construction and 15.9 GW awarded, in tender or announced.

Projects
28
Tracked capacity
39.3GW28 projects
Under construction
23.4GW17 projects
Awarded, in tender or announced
15.9GW11 projects

Capacity due by year of operation

5.1 GW2026
16.6 GW2027
1.4 GW2028
15.1 GW2029

Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.

Where it is being built

Al Humaij · 3,000 MWBisha · 3,000 MWAs Sdawi 2 · 3,000 MWAl-Leeth · 3,000 MWAfif 2 · 2,000 MWHaden · 2,000 MWMuwayh 2 · 2,000 MWAs Sdawi · 2,000 MWKhulis · 2,000 MWMuwayh · 2,000 MWAfif 1 · 2,000 MWHaden 2 · 2,000 MWHenakiyah 3 · 1,500 MWTabarjal 2 · 1,400 MWNajran · 1,400 MWAl Masa'a · 1,000 MWShiqri · 800 MWAl Darb · 600 MWTathleeth · 600 MWMawqaq · 600 MWSamtah · 600 MWSouth Ola · 500 MWKhushaybi 2 · 500 MWHenakiyah 2 · 400 MWSufun · 400 MWTabarjal · 400 MWRabigh 2 · 300 MWAmaala · 250 MW
  • Under construction
  • Awarded, in tender or announced

Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.

Capacity to come by province

  • Makkah13.3 GW7 projects
  • Madinah5.4 GW4 projects
  • Eastern Province5.0 GW2 projects
  • Riyadh4.0 GW2 projects
  • Aseer3.6 GW2 projects
  • Hail2.0 GW3 projects
  • Al-Jawf1.8 GW2 projects
  • Najran1.4 GW1 project

Projects by year of operation

ProjectCapacityTechnologyStageOperation
Haden2,000 MWSolar photovoltaicConstruction2026
Muwayh2,000 MWSolar photovoltaicConstruction2026
Henakiyah 2400 MWSolar photovoltaicConstruction2026
Tabarjal400 MWSolar photovoltaicConstruction2026
Rabigh 2300 MWSolar photovoltaicConstruction2026
Al Humaij3,000 MWSolar photovoltaicConstruction2027
Bisha3,000 MWSolar photovoltaicConstruction2027
Afif 22,000 MWSolar photovoltaicConstruction2027
As Sdawi2,000 MWSolar photovoltaicConstruction2027
Khulis2,000 MWSolar photovoltaicConstruction2027
Afif 12,000 MWSolar photovoltaicConstruction2027
Al Masa'a1,000 MWSolar photovoltaicConstruction2027

Source: Renewable Vision, The Saudi Renewables Tracker, records compiled 2026-09-28. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.