Skip to content
عربي
← All reportsBuilt from the tracker when this page opened.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.

Saudi renewables: what comes next

7 projects are yet to operate, 13.3 GW in all: 6.3 GW under construction and 7.0 GW awarded, in tender or announced.

Projects
7
Tracked capacity
13.3GW7 projects
Under construction
6.3GW4 projects
Awarded, in tender or announced
7.0GW3 projects

Capacity due by year of operation

4.3 GW2026
2.0 GW2027
7.0 GW2029

Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.

Where it is being built

Al-Leeth · 3,000 MWHaden · 2,000 MWMuwayh 2 · 2,000 MWKhulis · 2,000 MWMuwayh · 2,000 MWHaden 2 · 2,000 MWRabigh 2 · 300 MW
  • Under construction
  • Awarded, in tender or announced

Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.

Capacity to come by province

  • Makkah13.3 GW7 projects

Projects by year of operation

ProjectCapacityTechnologyStageOperation
Haden2,000 MWSolar photovoltaicConstruction2026
Muwayh2,000 MWSolar photovoltaicConstruction2026
Rabigh 2300 MWSolar photovoltaicConstruction2026
Khulis2,000 MWSolar photovoltaicConstruction2027
Al-Leeth3,000 MWSolar photovoltaicProcurement2029
Muwayh 22,000 MWSolar photovoltaicProcurement2029
Haden 22,000 MWSolar photovoltaicProcurement2029

Source: Renewable Vision, The Saudi Renewables Tracker, records compiled 2026-09-28. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.