Skip to content
عربي
← All reportsBuilt from the tracker when this page opened.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.

Saudi renewables: what comes next

2 projects are yet to operate, 4.0 GW in all: 4.0 GW under construction and 0 MW awarded, in tender or announced.

Projects
2
Tracked capacity
4.0GW2 projects
Under construction
4.0GW2 projects
Awarded, in tender or announced
0MW0 projects

Capacity due by year of operation

4.0 GW2027

Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.

Where it is being built

Afif 2 · 2,000 MWAfif 1 · 2,000 MW
  • Under construction

Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.

Capacity to come by province

  • Riyadh4.0 GW2 projects

Projects by year of operation

ProjectCapacityTechnologyStageOperation
Afif 22,000 MWSolar photovoltaicConstruction2027
Afif 12,000 MWSolar photovoltaicConstruction2027

Source: Renewable Vision, The Saudi Renewables Tracker, records compiled 2026-09-28. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.