Saudi renewables at a glance
3 projects and 2.1 GW tracked: 400 MW under construction against 300 MW operating.
- Projects
- 3
- Tracked capacity
- 2.1GW3 projects
- Operating
- 300MW1 project
- Under construction
- 400MW1 project
Capacity by stage
- Operating300 MW1 project
- Under construction400 MW1 project
- Awarded, in tender or announced1.4 GW1 project
Where the projects are
- Operating
- Under construction
- Awarded, in tender or announced
Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.
Capacity by technology
- Solar photovoltaic2.1 GW3 projects
Capacity by province
- Al-Jawf2.1 GW3 projects
Commercial operation by year
300 MW2020
400 MW2026
1.4 GW2029
Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.
The ten largest projects
| Project | Capacity | Technology | Stage | Place |
|---|---|---|---|---|
| Tabarjal 2 | 1,400 MW | Solar photovoltaic | Procurement | Al-Jawf |
| Tabarjal | 400 MW | Solar photovoltaic | Construction | Al-Jawf |
| Sakaka | 300 MW | Solar photovoltaic | Operational | Al-Jawf |