Skip to content
عربي
← All reportsBuilt from the tracker when this page opened.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.

Saudi renewables at a glance

4 projects and 4.7 GW tracked: 0 MW under construction against 4.2 GW operating.

Projects
4
Tracked capacity
4.7GW4 projects
Operating
4.2GW3 projects
Under construction
0MW0 projects

Capacity by stage

  • Operating4.2 GW3 projects
  • Awarded, in tender or announced500 MW1 project

Where the projects are

Ar Rass 2 · 2,000 MWKhushaybi · 1,500 MWAr Rass 1 · 700 MWKhushaybi 2 · 500 MW
  • Operating
  • Awarded, in tender or announced

Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.

Capacity by technology

  • Solar photovoltaic4.7 GW4 projects

Capacity by province

  • Al-Qassim4.7 GW4 projects

Commercial operation by year

700 MW2024
2.0 GW2025
1.5 GW2026
500 MW2029

Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.

The ten largest projects

ProjectCapacityTechnologyStagePlace
Ar Rass 22,000 MWSolar photovoltaicOperationalAl-Qassim
Khushaybi1,500 MWSolar photovoltaicOperationalAl-Qassim
Ar Rass 1700 MWSolar photovoltaicOperationalAl-Qassim
Khushaybi 2500 MWSolar photovoltaicProcurementAl-Qassim

Source: Renewable Vision, The Saudi Renewables Tracker, records compiled 2026-09-28. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.

Make it yours. Change it by asking, add or drop views, put your own logo and colours on it, and download the PDF.