Saudi renewables at a glance

5 projects and 6.5 GW tracked: 3.4 GW under construction against 1.1 GW operating.

Projects
5
Tracked capacity
6.5GW5 projects
Operating
1.1GW1 project
Under construction
3.4GW2 projects

Capacity by stage

  • Operating1.1 GW1 project
  • Under construction3.4 GW2 projects
  • Awarded, in tender or announced2.0 GW2 projects

Where the projects are

Al Humaij · 3,000 MWHenakiyah 3 · 1,500 MWHenakiyah 1 · 1,100 MWSouth Ola · 500 MWHenakiyah 2 · 400 MW
  • Operating
  • Under construction
  • Awarded, in tender or announced

Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.

Capacity by technology

  • Solar photovoltaic6.5 GW5 projects

Capacity by province

  • Madinah6.5 GW5 projects

Commercial operation by year

1.1 GW2025
400 MW2026
3.0 GW2027
2.0 GW2029

Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.

The ten largest projects

ProjectCapacityTechnologyStagePlace
Al Humaij3,000 MWSolar photovoltaicConstructionMadinah
Henakiyah 31,500 MWSolar photovoltaicProcurementMadinah
Henakiyah 11,100 MWSolar photovoltaicOperationalMadinah
South Ola500 MWSolar photovoltaicProcurementMadinah
Henakiyah 2400 MWSolar photovoltaicConstructionMadinah

Source: Renewable Vision, The Saudi Renewables Tracker, records compiled 2026-09-28. Map borders: Natural Earth, indicative.

Information, not advice. Built with RV Studio.