Saudi renewables at a glance
5 projects and 6.5 GW tracked: 3.4 GW under construction against 1.1 GW operating.
- Projects
- 5
- Tracked capacity
- 6.5GW5 projects
- Operating
- 1.1GW1 project
- Under construction
- 3.4GW2 projects
Capacity by stage
- Operating1.1 GW1 project
- Under construction3.4 GW2 projects
- Awarded, in tender or announced2.0 GW2 projects
Where the projects are
- Operating
- Under construction
- Awarded, in tender or announced
Circle area shows capacity. Locations are locality points, indicative, not surveyed sites.
Capacity by technology
- Solar photovoltaic6.5 GW5 projects
Capacity by province
- Madinah6.5 GW5 projects
Commercial operation by year
1.1 GW2025
400 MW2026
3.0 GW2027
2.0 GW2029
Years are the sources’ own commercial operation dates, planned or actual, and move. Projects without a date are left out.
The ten largest projects
| Project | Capacity | Technology | Stage | Place |
|---|---|---|---|---|
| Al Humaij | 3,000 MW | Solar photovoltaic | Construction | Madinah |
| Henakiyah 3 | 1,500 MW | Solar photovoltaic | Procurement | Madinah |
| Henakiyah 1 | 1,100 MW | Solar photovoltaic | Operational | Madinah |
| South Ola | 500 MW | Solar photovoltaic | Procurement | Madinah |
| Henakiyah 2 | 400 MW | Solar photovoltaic | Construction | Madinah |