Skip to content
عربي

Supplier guide · Last checked 23 November 2026

Contractor classification (تصنيف المقاولين) on Balady

What used to be called contractor classification is now the classification of city service providers, run by the Ministry of Municipalities and Housing on the Balady platform. Here is what you need before you apply, the steps, and the timings Balady gives.

Who is building the projects you can supply?

  • Supplier file (Excel)

    50+ Saudi projects with their contractors, and where each one registers suppliers. See 5 free rows

    ⁦⃁ 199⁩, paid once. Nothing renews. No VAT is added: the company is not registered for VAT.

Or join free, then pay SAR 9 for your first 30 days of RV Plus, with the file included. Paid once: it ends by itself and does not renew.

Join with email

Renewable Vision is not affiliated with the Ministry of Municipalities and Housing (MOMAH) or the Balady platform. This page is our own summary; to register or apply, use the official portal.

Open the official portal: Balady: Submitting a Classification Certificate Request

Registration checklist

This guide on one or two pages to print or share: the official portal, the documents to prepare, the steps with a box to tick, the official links and the day we last checked them.

How it works

The classification is requested and issued online on Balady, without a visit to an office. Establishments and engineering offices each have their own type of request, and you choose the fields of work you want to be classified in.

Energy buyers ask for it: Aramco, for example, lists the contractor classification certificate among the documents for service providers where it applies.

What you need first

Balady lists two conditions: your establishment must already hold a credit classification and a technical standards certificate. Its service page says no further documents are uploaded with the request itself.

Timings, validity and appeals

Balady’s questions page gives 16 working days for a decision, which the classification regulations allow to run to 60 working days, and says a classification certificate is valid for two years.

You can appeal the technical assessment once per certificate, within 60 days of its issue. A change of grade or field can be requested after 90 days.

A separate instant approval service issues a certificate at an approval grade. It can be used to obtain municipal licences, but Balady says it does not qualify the holder for government tenders.

Step by step

  1. Make sure your establishment holds a credit classification and a technical standards certificate.
  2. On Balady, open the service for submitting a classification certificate request.
  3. Choose the type: establishments, or engineering offices.
  4. Enter the unified national number (establishments) or the licence number (engineering offices) and verify the details.
  5. Choose the fields you want to be classified in, and submit the request.
  6. Once approved, the certificate appears under My Requests; the owner signs in with Nafath and downloads it.

Questions

Short answers

What is contractor classification in Saudi Arabia?
The classification of city service providers, formerly contractor classification: a certificate from the Ministry of Municipalities and Housing, issued on Balady, that classifies an establishment or engineering office in the fields it works in.
What do I need before applying for contractor classification?
A credit classification and a technical standards certificate for the establishment, according to Balady’s service page.
How long does contractor classification take?
Balady gives 16 working days, which can extend to 60 working days under the classification regulations.
How long is a classification certificate valid?
Two years, according to Balady’s questions page. Balady also has a renewal service.
Does instant approval let me bid in government tenders?
No. Balady says a certificate from the instant approval service can be used for municipal licences but does not qualify the holder for government tenders.

After you register

Know which projects and contractors to approach

Registration puts you on a buyer’s list; orders come from the developers and contractors building each project. The supplier file lists the upcoming and current Saudi solar, wind and storage projects, the developers and contractors named on each, and where each company registers suppliers, with the source and date behind every name. SAR 199, paid once, as an Excel file in English or Arabic.

What the supplier file holds, with free sample rows

The supplier file

⁦⃁ 199⁩paid once · 90 days of fresh downloads

Built from today’s data each time you download it, in English or Arabic. Paid with mada, Apple Pay or a card, with or without an account.

Official links

Sources

Written in our own words from these official pages. A step none of them states is left out rather than guessed; requirements change, so confirm each one on the official page before you apply.

  1. Balady, “Submitting a Classification Certificate Request”, read 23 November 2026 from a search engine’s copy of the official page (the site did not answer our reader)
  2. Balady FAQ on contractor classification, read 23 November 2026 from a search engine’s copy of the official page (the site did not answer our reader)
  3. Balady, “Instant Approval Service”, read 23 November 2026 from a search engine’s copy of the official page (the site did not answer our reader)
  4. Balady, “City service providers classification” (Arabic), read 23 November 2026 from a search engine’s copy of the official page (the site did not answer our reader)

Last checked 23 November 2026