Skip to content
عربي

Supplier registration · Developer

How to register as a supplier with ACWA Power

Where ACWA Power registers suppliers, as we found it on 16 November 2026, and the Saudi solar, wind and storage projects it is on. Free to read.

  • Developer

    What it is on Saudi projects

  • 13

    Saudi projects in the pipeline

  • 22,900

    MW of solar and wind

  • 6,000

    MWh of battery storage

Supplier file, 16 November 2026 · Its company page: projects and shares

Where suppliers register

Where ACWA Power registers suppliers

Open the page

https://eprocurement.acwapower.com/web/login.html

Page title
ACWA Power Portal
What it is
A registration portal: the page where the company registers suppliers. Registration works by invitation, as the note says.
Checked on
16 November 2026

Note from the check

It registers a supplier account: the portal FAQ (eprocurement.acwapower.com/attach/FAQ.pdf) says companies create a profile with the Register button and must complete all ACWA registration forms to have an active supplier account. The supplier guide (eprocurement.acwapower.com/attach/supplier_registration_guide.pdf) says new suppliers need an invitation email to register, so it is invitation-based in practice.

The company's website: www.acwapower.com

What this page does not tell you: it says where ACWA Power registers suppliers and which Saudi projects it is on. It does not replace the company's own requirements, which only the company sets and may change. Read them on its own page before you apply.

The full project lists and maps, free

Join free in one tap: download the project lists, open the maps and get an alert when a project moves.

Join with emailSign in

Saudi projects

The Saudi projects ACWA Power is on

Solar, wind and storage projects under construction, contracted or out to tender, from the site's trackers. Each links to its project page.

ProjectTechnologyCapacityStageIts role
Haden PV: 2000 MWSolar2,000 MWUnder constructionDeveloper
Muwayh PV: 2000 MWSolar2,000 MWUnder constructionDeveloper
NGHC PV Wind: 3800 MWSolar and wind3,900 MWUnder constructionDeveloper
Al Humaij PV: 3000 MWSolar3,000 MWUnder constructionDeveloper
Bisha PV: 3000 MWSolar3,000 MWUnder constructionDeveloper
Afif 1 PV: 2000 MWSolar2,000 MWUnder constructionDeveloper
Afif 2 PV: 2000 MWSolar2,000 MWUnder constructionDeveloper
Khulis PV: 2000 MWSolar2,000 MWUnder constructionDeveloper
Starah Wind: 2000 MWWind2,000 MWUnder constructionDeveloper
Shaqra Wind: 1000 MWWind1,000 MWUnder constructionDeveloper
Al KahafaBattery storage500 MW · 2,000 MWhContractedDeveloper
Al MuwayhBattery storage500 MW · 2,000 MWhContractedDeveloper
HadenBattery storage500 MW · 2,000 MWhContractedDeveloper

Who is building

Contractors and suppliers named on its projects

Named in public sources on the projects ACWA Power develops or buys from. The source for each, its date and the sentence quoted are in the supplier file.

CompanyRoleProjectsSources
Larsen & Toubro (L&T) · Where it registersEPC contractor66
China Energy Engineering Corporation (CEEC) · Where it registersEPC contractor46
PowerChina Huadong Engineering · Where it registersEPC contractor24
ArctechTrackers33
GameChange SolarTrackers22
GoldwindWind turbines22
JinkoSolarSolar modules22
Sineng ElectricInverters22
Envision EnergyWind turbines11
Nextpower ArabiaTrackers11
SungrowInverters11

Supplier file

Every project, every contractor, every source

For each Saudi pipeline project: the developers, the EPC contractor and suppliers, with the source, the date and the sentence quoted for each, and where all 35 companies register suppliers. One Excel workbook, in English or Arabic.

What is in the file

The supplier file

⁦⃁ 490⁩paid once · 90 days of fresh downloads

Built from today’s data each time you download it, in English or Arabic. Paid with mada, Apple Pay or a card, with or without an account.