Skip to content
عربي

Service 03 · Carbon · RV Assurance

Digital MRV Data Room.

A secure workspace for monitoring evidence, meter registries, calibration records and QA/QC logs, version-stamped and source-linked.

Disclaimers

  1. 01Renewable Vision is not presented as a DNA-accredited VVB unless formal accreditation has been obtained.
  2. 02Renewable Vision may support project preparation, MRV evidence management, and coordination with accredited VVBs.
  3. 03Validation and verification opinions must be issued only by DNA-accredited VVBs.
  4. 04Any future Renewable Vision assurance activity must comply with GCOM criteria, sectoral scope accreditation, impartiality, conflict-of-interest, and quality management requirements.
  5. 05A project supported by Renewable Vision Advisory should not be validated or verified by the same legal or operational unit unless conflict-of-interest rules are fully satisfied and permitted by GCOM.
Service 03

Digital MRV Data Room

Verification findings almost always trace back to evidence problems: a missing permit, an additionality claim with nothing behind it, a monitoring report no one can find. The data room is the free company workspace in the RV Assurance portal. It files your evidence by GCOM stage and document type, the way a VVB reviews it, and keeps your team, the RV team's review notes, monitoring periods and credit holdings in one place.

Deliverables

What you receive at the end of the engagement.

Company workspace with team roles
Evidence filed by GCOM document type
Review status and notes on each file
Correction requests in one list
Monitoring periods with report attachments
Credit holdings, transfers and retirements
Stage history for every project

In scope

  • Company account tied to your Commercial Registration, verified by the RV team
  • Team members invited by the owner, each accepting their own invitation
  • Projects tracked through the GCOM journey, from draft to registration
  • Evidence uploads for the PDD, ownership, permits and EIA, additionality, SDG contribution, validation, monitoring and verification reports, and conflict-of-interest attestation
  • Files locked once a project is submitted, so the reviewed evidence cannot change
  • Monitoring periods with claimed reductions and the monitoring and verification reports attached
  • Credit holdings with transfer and retirement, recorded by serial number
  • 100 MB of storage per company, files up to 20 MB

Not in scope

  • Meter registry, calibration reminders and automatic data import from SCADA or EMS (not in the portal yet)
  • Field meter installation or calibration services
  • On-site monitoring engineer (we coordinate, we do not staff)
  • Verification opinion (DNA-accredited VVB only)
Engagement pre-requisites

What we need from you to begin.

  • A Saudi Commercial Registration number
  • An email address at your company
  • Project basics: location, start date and expected annual reductions
  • Your evidence files as PDF, Word, Excel, PNG or JPEG
GCOM rulebook references

Grounding clauses we work to.

  • GCOM Criteria s.3.2.1
    Verification confirms reported emission reductions are real, verified, and additional under the PDD requirements.
  • GCOM Monitoring Form, Section A
    Monitoring period, version, completion date, and monitored parameters must be documented per project.
  • GCOM Standards s.5
    Document control, record control, audit trail, and secure evidence repository required.
Important disclaimer

Renewable Vision is not presented as a DNA-accredited VVB unless formal accreditation has been obtained. We support project preparation, MRV evidence management, and coordination with accredited VVBs. Validation and verification opinions must be issued only by DNA-accredited VVBs.