28 factories and localisation deals in Saudi Arabia, from power transformers to desalination pumps, each with its source. Beside them: US$2.54 bn of Saudi imports in 2025 of large transformers, MV/HV switchboards and inverters (UN Comtrade).
Get the tracker as PDF: 28 factories and deals
The full table, with each row's product, place, stage, date and source. Join free with Google and the download starts as soon as you are in.
28
factories and localisation deals tracked
Each with one official source or two independent ones. Announcements still waiting for a source are left out.
US$2.54 bn
Saudi imports in 2025 of the main equipment codes charted on this page (HS 850423, 853720, 850440)
Source: UN Comtrade
1 August 2027
Next local-content deadline (LCGPA): split air conditioners, water pumps, water valves and copper wires need a minimum local-content share to benefit from the Mandatory List
Source: Saudi Press Agency, 2026-02-17
26 November 2026
Last checked
Transformers and parts
7 factories and deals
Liquid-dielectric transformers over 10,000 kVA (HS 850423)
Saudi imports, US$ million
Largest supplier in 2025: China (72.3%) Supplier share for HS 850421–850423 combined.
Source: UN Comtrade
Electrical Industries Company (EIC, Saudi Exchange 1303)
Tanks and radiators for medium-, high- and extra-high-voltage power transformers
- Place
- Not disclosed
- Capacity and investment
- SAR 150 m
- Stage
- Announced · Board approval 25 Oct 2026; construction from Q1 2027; commercial production Q3 2029
- Date
- 25 October 2026
- Source
- Saudi Exchange (EIC issuer announcement), 2026-10-26
Saudi Power Transformers Co. (SPTC, an EIC subsidiary)
EHV and HV power transformers and reactors for Saudi Energy under a localisation contract; plant expansion
- Place
- Dammam (the location is not in the filing)
- Capacity and investment
- Contract SAR 1.41 bn over 84 months; expansion about SAR 192 m
- Partner
- Saudi Energy (buyer)
- Stage
- Agreement signed · Contract signed 17 Sep 2025; financial impact expected 2027–2033
- Date
- 17 September 2025
- Source
- Saudi Exchange (EIC issuer announcement), 2025-09-17
Reinhausen (Reinhausen Saudi Arabia Energy Company)
Vacuum on-load tap-changers and the ETOS transformer operating system: assembly, testing and service
- Place
- Eastern Province (leased facility of 6,000–7,000 m²)
- Capacity and investment
- 500 or more units a year · About EUR 10 m by 2030
- Partner
- AKID Advisory
- Stage
- Announced · Agreement signed 1 Sep 2026; licensing and manufacturing start early 2027
- Date
- 1 September 2026
- Source
- Reinhausen (own newsroom), 2026-09-03
National Transformer Company (Voltamp Energy 80%, Al-Sharif group)
High-voltage power transformers: 132 kV in phase 1, then 380 kV in phase 2
- Place
- Western region, near Jeddah
- Capacity and investment
- US$10 m plan (as reported by Zawya)
- Partner
- Al-Sharif Industrial Investment
- Stage
- Under construction · Phase 1 was due Q1 2026 (completion not confirmed); phase 2 by 2027
- Date
- 2 March 2026
- Source
- Voltamp Energy ESG Report 2024 (own), 2025-03
Siemens Energy
Large power transformers (a new factory within the Dammam expansion); repair hub
- Place
- Dammam
- Capacity and investment
- Not disclosed; 130–150 jobs · US$150 m
- Stage
- Announced · Announced by the company's chief executive in interviews; no Siemens Energy press release found
- Date
- 12 October 2026
- Source
- Arab News (Asharq Bloomberg interview), 2026-10-12
Alfanar with I-TAC
Current transformers (CTs) for ring main units
- Place
- Dammam
- Capacity and investment
- Not disclosed
- Partner
- I-TAC
- Stage
- Agreement signed · Localisation programme over 2026–2029
- Date
- 24 August 2026
- Source
- alfanar Electric Sustainability Report 2025, 2026-08-24
Elsewedy Electric
Power transformers
- Place
- Dammam 3rd Industrial City
- Capacity and investment
- Not disclosed
- Stage
- Announced · Factory contract reported in Dec 2025 as one of nine planned Saudi factories; amounts not shown until Elsewedy's own disclosure is read
- Date
- 17 December 2025
- Source
- Billionaires.Africa, 2026-09-10
Switchgear and panels
5 factories and deals
Boards and panels over 1,000 V: MV/HV switchgear assemblies (HS 853720)
Saudi imports, US$ million
Largest supplier in 2025: China (59.4%)
Source: UN Comtrade
Alfanar
Smart SF6-free ring main units (RMU)
- Place
- Riyadh Industrial City
- Capacity and investment
- Not disclosed
- Stage
- Operating · Inaugurated by the Ministry of Energy (the ministry's page is undated)
- Date
- Undated source page
- Source
- Ministry of Energy, undated
Al-Gihaz Holding
Electrical panels and energy equipment for connection, control, automation and distribution
- Place
- Riyadh Industrial City
- Capacity and investment
- 25,000 units a year, with plans to double
- Stage
- Operating · Newly launched at the time of the Ministry of Energy's visit (the page is undated)
- Date
- Undated source page
- Source
- Ministry of Energy, undated
Schneider Electric Saudi Arabia
UPS, LV switchboards, distribution boards, MV and GIS switchgear, MV vacuum breakers; a new plant at SPARK
- Place
- Riyadh and Dammam; King Salman Energy Park (SPARK)
- Capacity and investment
- 12 production lines added in five years; 32 planned by 2030
- Stage
- Operating · Existing lines make products locally; the SPARK plant was "preparing to open"
- Date
- 3 November 2025
- Source
- Schneider Electric Saudi Arabia (own press release), 2025-11-03
SEP (System House Factory for Electric Panels Co.)
MV switchgear: the full ABB UniGear ZS1 range under licence
- Place
- Riyadh
- Capacity and investment
- Not disclosed
- Partner
- ABB
- Stage
- Agreement signed · Licence extended to the full range on 14 Oct 2026
- Date
- 14 October 2026
- Source
- ABB (own news centre), 2026-10-14
Al Sharhan Energy + Sieyuan Electric (JV)
High-voltage gas-insulated switchgear (GIS), mobile and prefabricated substations
- Place
- Not disclosed
- Capacity and investment
- Not disclosed
- Partner
- Sieyuan Electric
- Stage
- Agreement signed · Joint venture signed Dec 2025; no site or start date published
- Date
- 30 December 2025
- Source
- Al Sharhan Energy company profile (own), 2026-01
Cables and copper
2 factories and deals
Insulated conductors over 1,000 V: MV/HV cables (HS 854460)
Saudi imports, US$ million
Source: UN Comtrade
ZTT Group
Submarine and land power cables; fibre-optic cables
- Place
- Ras Al-Khair Port (80,000 m² leased from Mawani)
- Capacity and investment
- 500 km of submarine and 500 km of land cable, and 12,500 km of fibre a year · SAR 375 m
- Partner
- Saudi Ports Authority (Mawani)
- Stage
- Announced · Land lease signed at FII9 (Oct 2025)
- Date
- 31 October 2025
- Source
- Saudi Press Agency, 2025-10-31
Rawas + Zhejiang Hailiang (JV, Hailiang 51%)
Copper tubes, copper busbars, recycled refined copper and copper foil
- Place
- Near Dammam port
- Capacity and investment
- 150,000 t a year in two phases, of which 20,000 t busbars · About US$566 m
- Partner
- Zhejiang Hailiang
- Stage
- Agreement signed · Joint-venture agreement signed; no construction timeline
- Date
- 12 May 2026
- Source
- MEED (citing partners' statement), 2026-05-12
HVDC and transmission-line products
2 factories and deals
Alfanar
HVDC converter-station systems: converter valves, cooling systems and components
- Place
- Riyadh
- Capacity and investment
- About SAR 375 m (a ministry figure reported by trade press; not on Alfanar's own page)
- Stage
- Operating · Inaugurated in January 2026
- Date
- 20 January 2026
- Source
- alfanar Electric Sustainability Report 2025, 2026-08-24
Bahra Electric + Sicame Group (JV "Bahra Salvi")
Transmission-line products (the Salvi range)
- Place
- Jeddah (Bahra's facility)
- Capacity and investment
- Not disclosed
- Partner
- Sicame Group
- Stage
- Agreement signed · Joint venture formed Sep 2026; the release does not say what will be made in Jeddah
- Date
- 29 September 2026
- Source
- Sicame Group (own news), 2026-09-29
Battery storage
1 factory or deal
Lithium-ion accumulators (HS 850760)
Saudi imports, US$ million
Largest supplier in 2025: China (98.7%)
Source: UN Comtrade
Al Rajhi Electrical (with Cornex and Shanghai Greengrid)
Energy-storage products under a 5.5 GWh supply and localisation agreement
- Place
- Signed in Dammam
- Capacity and investment
- 5.5 GWh over three years
- Partner
- Cornex New Energy; Shanghai Greengrid
- Stage
- Agreement signed · Supply agreement signed 3 Feb 2026; a local factory is not confirmed
- Date
- 3 February 2026
- Source
- pv magazine (ESS News), 2026-02-04
Solar components
5 factories and deals
Static converters, including PV inverters and UPS (HS 850440)
Saudi imports, US$ million
Largest supplier in 2025: China (67.6%)
Source: UN Comtrade
Nextpower Arabia (Nextpower + Abunayyan Holding)
Solar trackers
- Place
- Jeddah (42,000 m² site)
- Capacity and investment
- Up to 12 GW a year
- Partner
- Abunayyan Holding
- Stage
- Under construction · Opening was due in Q2 2026; no opening notice found by 26 Nov 2026
- Date
- 12 January 2026
- Source
- Nextpower (own investor release), 2026-01-12
Desert Technologies
TOPCon solar cells (3 GW) and modules (2 GW)
- Place
- Jeddah 3rd Industrial City (170,000 m²)
- Capacity and investment
- 5 GW; the existing line is 110 MW
- Partner
- MODON
- Stage
- Announced · The company says it is "transitioning" to the 5 GW plant; no start date given
- Date
- 16 November 2026
- Source
- Desert Technologies (own page), 2026-11-16
JinkoSolar + RELC (PIF) + Vision Industries (40/40/20)
N-type solar cells and modules
- Place
- Not disclosed
- Capacity and investment
- 10 GW of cells and 10 GW of modules · About US$1 bn
- Partner
- RELC; Vision Industries
- Stage
- Delayed (company says) · The company's own H1 2026 presentation: "flexible timetable based on policy changes"
- Date
- 27 August 2026
- Source
- JinkoSolar H1 2026 investor presentation, 2026-08-27
GameChange Solar
Genius Tracker solar trackers
- Place
- Saudi Arabia (city not stated)
- Capacity and investment
- 6 GW a year after doubling
- Stage
- Operating · Expansion of its Saudi manufacturing to 6 GW announced Jun 2025, due Sep 2025
- Date
- 3 June 2025
- Source
- GameChange Solar (own release, PR Newswire), 2025-06-03
TrinaTracker (Trina Tracker for Renewable Energy)
Vanguard solar trackers and control systems
- Place
- Jeddah 3rd Industrial City (MODON land lease)
- Capacity and investment
- 3 GW a year
- Partner
- MODON
- Stage
- Announced · Operations were set to begin in Q1 2025; no later confirmation that production started
- Date
- 19 February 2025
- Source
- Trinasolar (own release), 2025-02-19
Wind components
1 factory or deal
Wind-powered generating sets (HS 850231)
Saudi imports, US$ million
Source: UN Comtrade
Al Yamamah Steel Industries (Saudi Exchange 1304)
Steel towers for wind turbines, over 130 m high and up to 6 m in diameter
- Place
- Yanbu Industrial City
- Capacity and investment
- 50,000 t a year
- Stage
- Operating · Commercial production since 9 Oct 2025
- Date
- 9 October 2025
- Source
- Saudi Press Agency, 2025-10-10
Cooling (HVAC)
1 factory or deal
Zamil Air Conditioners (SENAAT group)
Water-cooled centrifugal chillers up to 5,000 TR
- Place
- Dammam
- Capacity and investment
- Up to 5,000 TR a unit
- Stage
- Operating · Registered on the LCGPA Mandatory List (the release is undated)
- Date
- Undated source page
- Source
- SENAAT (own press release), undated
Water equipment
4 factories and deals
Energy Recovery, Inc. (Energy Recovery Company, Saudi entity)
Energy recovery devices (ERDs) for desalination
- Place
- Near Dammam Second Industrial City (3,750 m² leased)
- Capacity and investment
- Not disclosed; market SAR 547 m (Saudi SAR 247 m, region SAR 300 m)
- Partner
- Saudi Water Authority
- Stage
- Announced · Production scheduled from Q1 2027; over 80% local content targeted
- Date
- 28 July 2026
- Source
- Saudi Press Agency, 2026-07-28
Torishima
High-pressure pumps for desalination
- Place
- Jeddah
- Capacity and investment
- Not disclosed
- Partner
- Saudi Water Authority
- Stage
- Agreement signed · Agreement signed; in the implementation phase
- Date
- 3 September 2026
- Source
- Saudi Press Agency, 2026-09-03
Toray
Reverse-osmosis desalination membranes
- Place
- Dammam
- Capacity and investment
- Not disclosed
- Partner
- Saudi Water Authority
- Stage
- Operating · Producing since 2025
- Date
- 3 September 2026
- Source
- Saudi Press Agency, 2026-09-03
Alfanar
Distributed control systems (DCS) for the water sector
- Place
- Riyadh
- Capacity and investment
- Not disclosed
- Partner
- Saudi Water Authority
- Stage
- Agreement signed · Agreement signed; in the implementation phase
- Date
- 3 September 2026
- Source
- Saudi Press Agency, 2026-09-03
The programmes that set the targets
Each in one sentence, with its source.
LCGPA minimum local content, stage 1
233 Mandatory List products need a minimum local-content share from 1 Aug 2026; split air conditioners, water pumps, water valves and copper wires follow from 1 Aug 2027.
Source: Saudi Press Agency, 2026-02-17
LCGPA minimum local content, expansion
The requirement extends to 965 products in 14 Mandatory List sectors from 1 Jun 2028.
Mandatory List of national products
449 products were added in 2025, taking the list past 1,670 products; local content reached 51.2% of government procurement (33.7% in 2020).
Central PV inverters: localisation agreements
The Ministry of Energy sponsored two agreements on 10 Sep 2026 to localise central inverters; one is with Solar Nest (Sineng).
Source: Global Trade Alert, 2026-09-10
Saudi Energy BENA localisation programme
More than 750 local factories supplied Saudi Energy in 2025 (650 in 2024), yet product localisation fell to 68.4% from 71%. Targets: GIS and breakers, transformers, cables up to HV, smart meters, ring main units, MV joints and terminations.
Saudi Energy prequalified makers
Saudi Energy publishes its list of prequalified manufacturers and suppliers of distribution-network materials (edition to March 2026). Linked here, not copied.
Source: Saudi Energy (official PDF, 'Public External'), 2026-04-08
Aramco iktva
Aramco reports 70% local content in its procurement and now aims for 75% by 2030.
Source: Aramco (own news), 2026-02-11
Ministry of Energy component target
The Ministry of Energy aims for 75% localisation of energy components by 2030.
Source: Ministry of Energy, undated
Saudi Water Authority localisation
18 water-industry localisation opportunities; six are in implementation, worth SAR 2.8 bn across eight factories.
Source: Saudi Press Agency, 2026-09-03
Ministry of Industry monthly indicators
July 2026: 438 new industrial licences and 189 factories started production, across all sectors.
Listed makers: 2025 results and latest period
Aggregates from each company's Saudi Exchange filing or its own report.
| Company | Revenue 2025 | Net profit 2025 | Latest period | Backlog | Source |
|---|---|---|---|---|---|
| Riyadh Cables Group (4142) | SAR 10.67 bn (+18.5%) | SAR 1.08 bn (+32.3%) | 9M 2026 net profit SAR 914 m (+11.9%) | SAR 5.1 bn at end-2025; 96% utilisation | Saudi Exchange (issuer announcement), 2026-03-15 |
| Al-Babtain Power and Telecommunication (2320) | SAR 2.86 bn (+1.6%) | SAR 453 m (+70.5%) | 9M 2026 net profit SAR 443 m (+41.5%) | About SAR 3.2 bn at 30 Sep 2026 | Saudi Exchange (issuer announcement), 2026-03-10 |
| Alkhorayef Water and Power Technologies (2081) | SAR 2.47 bn (+26.7%) | SAR 256 m (+11.2%) | Q3 2026 revenue SAR 531 m (−11.8%); net profit SAR 65 m (−6.3%) | — | Saudi Exchange (issuer announcement), 2026-03-30 |
| Electrical Industries Company (1303) | SAR 2.3 bn (+15.6%) | SAR 630 m (+56.8%) | 9M 2026 net profit SAR 580 m (+38%) | — | Saudi Exchange (issuer announcement), 2026-03-02 |
| Middle East Specialized Cables (MESC) (2370) | SAR 1.48 bn (+29.6%) | SAR 102 m (+11.8%) | 9M 2026 revenue SAR 1.56 bn (+41.8%); net profit SAR 84 m (+21.4%) | — | Saudi Exchange (issuer announcement), 2026-03-31 |
| Saudi Cable Company (2110) | SAR 156 m | SAR 202 m | 9M 2026 net profit SAR 44 m (SAR 102 m a year earlier); a SAR 400 m rights issue approved by the CMA on 10 Nov 2026, subject to an EGM. 2025 profit came from an associate (operating loss SAR 101 m); the auditor flagged a material uncertainty on going concern. | — | Saudi Cable Company Annual Report 2025 (auditor's report), 2026-04-02 |
How this tracker is built
Every row comes from one committed data file, built from our research of 26 November 2026 and its follow-up checks. A row is shown only when one official source (a company release or report, a Saudi Exchange filing, a ministry, a regulator or the Saudi Press Agency) or two independent sources support it; the rest wait. A plant is called operating only where such a source says it produces. Import figures are UN Comtrade's, as reported; we publish aggregates only and the page stays free. No person is named.