Independent research
Industrial markets and investment
Research on Saudi equipment trade, power infrastructure and the economics of supplying industry.
Short reports, each a free PDF to read and share: what Saudi Arabia buys and sells of the equipment that power and industry run on, where it comes from, who builds and pays for the projects, and what the figures mean for a buyer or a supplier.
The reports are free to read, download and share.
Featured research · Renewables investment and operations
SAR 30.87bn
Gross investment across the seven generation projects of the 15 GW round at 30 September 2026.
Saudi Arabia’s 15 GW round: how SAR 30.87 billion splits by project
Also featured · Market entry
9.66 GW
Generation EPC awards to CEEC-led consortia, as named in public sources: a sample, not a census.
New · Localisation tracker
Saudi electrical-equipment localisation tracker
28 factories and localisation deals, from power transformers to desalination pumps, each with its source and beside the import bill it replaces.
Reports in English
Independent research reports
Free to download, with no membership or sign-in. Each PDF opens in a new tab.
Newest first within each sector.
Renewables investment and operations
SAR 30.87bnGross investment across the seven generation projects of the 15 GW round at 30 September 2026.
Saudi Arabia’s 15 GW round: how SAR 30.87 billion splits by project
October 2026 review. Five solar plants and two wind farms make up the SAR 30.87bn round, and wind carries the highest investment per MW. Earlier solar plants and three storage agreements take the wider project list to SAR 46.48bn.
Read the 13-page report (PDF, opens in a new tab)Read the summary
12 GWFive ACWA solar projects under construction at 30 September 2026, due at full commercial operation in 2027 and 2028.
Saudi Arabia’s solar O&M market: 12 GW moving from construction to operation
October 2026 review. ACWA’s five solar plants reach full commercial operation in two waves of 6 GW, in Q4 2027 and Q1 2028. Fourteen grid-connected plants already account for 11.913 GW and need field support now.
Read the 12-page report (PDF, opens in a new tab)Read the summary
The capital behind five Saudi solar plants
Reconcile installed capacity with the capital committed to five Saudi solar projects.
Read the 7-page report (PDF, opens in a new tab)Read the summary
Grid storage
$1.73bnSaudi imports of lithium-ion accumulators in calendar 2025 (HS 850760).
Saudi battery storage: $1.73bn of lithium-ion imports and the grid build-out
Lithium-ion imports nearly quadrupled in 2025, and China supplied 98.7% of them. Customs records cover every end use, so the report measures grid demand through the storage contracts and sets out how to compare bids on energy delivered at the meter.
Read the 8-page report (PDF, opens in a new tab)Read the summary
12 GWhGroup 2 tendered energy capacity: 3,000 MW across six sites, each designed for four hours.
Saudi battery storage, Group 2: the deadline extension and what bidders should do now
October 2026 review. Group 2 tenders six four-hour sites, 3,000 MW in all. The 12 November bid date rests on a press report citing an unnamed source, so bidders should take their status from the procurement portal and compare offers on guaranteed usable MWh.
Read the 11-page report (PDF, opens in a new tab)Read the summary
What a battery can deliver at the evening peak
Compare three Australian assets and translate an evening peak into an energy guarantee.
Read the 7-page report (PDF, opens in a new tab)Read the summary
Wind power
3.7 GWCombined generating capacity at Starah, Shaqra and Yanbu, all under construction.
Saudi wind supply chain: who supplies turbines and towers for three projects totalling 3.7 GW under construction
Goldwind supplies the turbines at Starah and Shaqra and makes towers at its Shaqra plant; at Yanbu, Windey supplies the turbines and Al Yamamah Steel holds the tower contract with SEPCOIII. The report shows where a local fabricator can start.
Read the 8-page report (PDF, opens in a new tab)Read the summary
Market entry
9.66 GWGeneration EPC awards to CEEC-led consortia, as named in public sources: a sample, not a census.
Who builds Saudi renewables: EPC contractors and equipment makers, 2026 league table
October 2026 review. L&T and CEEC-led consortia hold the largest generation EPC awards in the sample; Goldwind has the largest disclosed wind turbine orders and BYD the largest storage disclosure. The table covers contractors named in public sources only, not a census of Saudi awards.
Read the 13-page report (PDF, opens in a new tab)Read the summary
$1.89bnSaudi imports across four electrical-equipment headings in 2025.
Supplying Saudi utilities and energy majors: the qualification path for electrical equipment
Choose a buyer and product family before funding the tests.
Read the 8-page report (PDF, opens in a new tab)Read the summary
Grid equipment
57Transmission substations energised by Saudi Energy in the first nine months of 2026.
57 new substations: the Saudi grid build-out and the equipment it pulls through
Work back from the energisation date to the order.
Read the 8-page report (PDF, opens in a new tab)Read the summary
$640.1mSaudi imports of boards and panels above 1 kV in 2025 (HS 853720).
Saudi medium-voltage switchgear: imports, origins and the local manufacturing route
Panel imports climbed as breaker imports fell; see where a local builder can compete on design and delivery slot.
Read the 8-page report (PDF, opens in a new tab)Read the summary
$910mSaudi import value in 2025 for liquid-dielectric transformers above 10 MVA.
The changing sources of Saudi power transformers
Trace the shift in origin behind Saudi purchases of large liquid-dielectric transformers.
Read the 8-page report (PDF, opens in a new tab)Read the summary
Data centres
100 MWHUMAIN and DataVolt’s joint development within Oxagon’s first phase.
Saudi AI data centres: the power equipment behind the compute
Static converter imports reached $989.8m in 2025, and China’s share of large transformer imports rose from 4.8% in 2023 to 72.5%. Oxagon’s first 100 MW gives suppliers a more precise lead than the 1,500 MW campus plan.
Read the 8-page report (PDF, opens in a new tab)Read the summary
Energy costs
SAR 900Monthly fixed charge from 1 January 2027 for an ordinary industrial or commercial meter with an approved breaker of 300 A or more.
Saudi electricity tariffs in 2027: how the new fixed charge and slabs change business bills
From 1 January 2027 a monthly charge tied to the approved breaker replaces the meter fee, and industrial energy moves from 20 to 23 halalas per kWh. In the illustrative bills, a 400 A factory pays SAR 2,675 more a month and the shop carries the highest fixed share.
Read the 8-page report (PDF, opens in a new tab)Read the summary
Industrial materials
$257.7mSaudi exports of cable above 1 kV in 2025.
Saudi Arabia’s trade in power cables: what the two-way flow tells buyers
Higher-voltage cable moved both ways; compare mills on one metal-price basis.
Read the 8-page report (PDF, opens in a new tab)Read the summary
Saudi Arabia’s two-way trade in copper winding wire
Follow the shift from net imports to net exports by weight and see which markets supplied and bought the wire.
Read the 8-page report (PDF, opens in a new tab)Read the summary
Building equipment
Saudi room cooling: the import mix behind the headline
Understand why steady import value can coexist with a sharp change in unit counts.
Read the 7-page report (PDF, opens in a new tab)Read the summary
From the report library
Saudi Arabia’s energy–industry system
Maps the refinery system alongside chemical investments and the electricity system. The report separates refinery capacity from ownership shares and capacity additions from replacement units.
Global critical minerals
Traces six material groups used across grid equipment, batteries and clean energy supply chains. The report compares where materials are mined and where they are refined, and links concentration to the stage that constrains supply.
How we research
Trade figures come from UN Comtrade and the World Bank’s WITS, company figures from filings and releases, tariffs from Saudi Energy and the regulator, and technical terms from standards bodies. Each report lists its sources.
Independent research; illustrative cases are labelled.