Skip to content
عربي

Free report · Data centres

What power equipment do Saudi AI data centres need, and who supplies it?

Static converter imports reached $989.8m in 2025, and China’s share of large transformer imports rose from 4.8% in 2023 to 72.5%. Oxagon’s first 100 MW gives suppliers a more precise lead than the 1,500 MW campus plan.

The report

Saudi AI data centres: the power equipment behind the compute

What the report covers

  • Oxagon at three scales: a 1,500 MW campus plan, a 360 MW first phase and HUMAIN and DataVolt’s 100 MW joint development, with phased operations expected from Q4 2027.
  • Imports of static converters, including UPS equipment, reached $989.8m in 2025.
  • China’s share of large-transformer imports rose from 4.8% in 2023 to 72.5% in 2025.
  • Technical approval rests with the owner: specify the resilience target and who certifies it.

100 MW

HUMAIN and DataVolt’s joint development within Oxagon’s first phase.

Download the PDF (free, no sign-up) (PDF, opens in a new tab)

8 pages · in English · published 24 November 2026

Sources: NEOM · DataVolt · SDAIA via Saudi Press Agency · AMD · Groq · UN Comtrade Plus · SERA Saudi Arabian Grid Code

The PDF lists every source, with links and the dates they were retrieved.

Related reports

All industrial reports