What power equipment do Saudi AI data centres need, and who supplies it?
Static converter imports reached $989.8m in 2025, and China’s share of large transformer imports rose from 4.8% in 2023 to 72.5%. Oxagon’s first 100 MW gives suppliers a more precise lead than the 1,500 MW campus plan.
The report
Saudi AI data centres: the power equipment behind the compute
What the report covers
- Oxagon at three scales: a 1,500 MW campus plan, a 360 MW first phase and HUMAIN and DataVolt’s 100 MW joint development, with phased operations expected from Q4 2027.
- Imports of static converters, including UPS equipment, reached $989.8m in 2025.
- China’s share of large-transformer imports rose from 4.8% in 2023 to 72.5% in 2025.
- Technical approval rests with the owner: specify the resilience target and who certifies it.
100 MW
HUMAIN and DataVolt’s joint development within Oxagon’s first phase.
Download the PDF (free, no sign-up) (PDF, opens in a new tab)
8 pages · in English · published 24 November 2026
Sources: NEOM · DataVolt · SDAIA via Saudi Press Agency · AMD · Groq · UN Comtrade Plus · SERA Saudi Arabian Grid Code
The PDF lists every source, with links and the dates they were retrieved.
Related reports
Renewables investment and operations
How does SAR 30.87 billion of Saudi Arabia’s 15 GW round split by project?
October 2026 review. Five solar plants and two wind farms make up the SAR 30.87bn round, and wind carries the highest investment per MW. Earlier solar plants and three storage agreements take the wider project list to SAR 46.48bn.
Renewables investment and operations
Who will run and maintain the 12 GW of Saudi solar coming into operation in 2027 and 2028?
October 2026 review. ACWA’s five solar plants reach full commercial operation in two waves of 6 GW, in Q4 2027 and Q1 2028. Fourteen grid-connected plants already account for 11.913 GW and need field support now.
Renewables investment and operations
How much capital does a gigawatt of Saudi solar take?
Reconcile installed capacity with the capital committed to five Saudi solar projects.