Which equipment do 57 new Saudi substations pull through, and when?

Work back from the energisation date to the order.

The report

57 new substations: the Saudi grid build-out and the equipment it pulls through

What the report covers

  • Saudi Energy energised 57 transmission substations from January to September 2026.
  • The transmission network grew from 104,738 to 110,950 circuit-km year on year, 6,212 circuit-km more.
  • Large-transformer imports rose from $223.6m in 2023 to $910.1m in 2025, and imports of panels above 1 kV from $225.0m to $640.1m.
  • For a target utility: the substations due for award, the transformer rating, the delivery date, and whether the utility or the EPC buys the unit.

57

Transmission substations energised by Saudi Energy in the first nine months of 2026.

Download the PDF (free, no sign-up) (PDF, opens in a new tab)

8 pages · in English · published 24 November 2026

Sources: Saudi Energy earnings release and nine-month operating results · Saudi Energy financial filing · Saudi Exchange · UN Comtrade Plus

The PDF lists every source, with links and the dates they were retrieved.