Which equipment do 57 new Saudi substations pull through, and when?
Work back from the energisation date to the order.
The report
57 new substations: the Saudi grid build-out and the equipment it pulls through
What the report covers
- Saudi Energy energised 57 transmission substations from January to September 2026.
- The transmission network grew from 104,738 to 110,950 circuit-km year on year, 6,212 circuit-km more.
- Large-transformer imports rose from $223.6m in 2023 to $910.1m in 2025, and imports of panels above 1 kV from $225.0m to $640.1m.
- For a target utility: the substations due for award, the transformer rating, the delivery date, and whether the utility or the EPC buys the unit.
57
Transmission substations energised by Saudi Energy in the first nine months of 2026.
Download the PDF (free, no sign-up) (PDF, opens in a new tab)
8 pages · in English · published 24 November 2026
Sources: Saudi Energy earnings release and nine-month operating results · Saudi Energy financial filing · Saudi Exchange · UN Comtrade Plus
The PDF lists every source, with links and the dates they were retrieved.
Related reports
Grid equipment
Can a local builder compete for Saudi medium-voltage switchgear?
Panel imports climbed as breaker imports fell; see where a local builder can compete on design and delivery slot.
Grid equipment
Where does Saudi Arabia buy its large power transformers now?
Trace the shift in origin behind Saudi purchases of large liquid-dielectric transformers.
Renewables investment and operations
How does SAR 30.87 billion of Saudi Arabia’s 15 GW round split by project?
October 2026 review. Five solar plants and two wind farms make up the SAR 30.87bn round, and wind carries the highest investment per MW. Earlier solar plants and three storage agreements take the wider project list to SAR 46.48bn.