Goldwind supplies the turbines at Starah and Shaqra and makes towers at its Shaqra plant; at Yanbu, Windey supplies the turbines and Al Yamamah Steel holds the tower contract with SEPCOIII. The report shows where a local fabricator can start.
The report
Saudi wind supply chain: who supplies turbines and towers for three projects totalling 3.7 GW under construction
What the report covers
- Starah (2,000 MW), Shaqra (1,000 MW) and Yanbu (700 MW): 3.7 GW under construction, with EPC and tower contracts signed.
- Goldwind supplies the turbines at Starah and Shaqra and makes towers at its Shaqra plant; at Yanbu, Windey supplies the turbines and SEPCOIII holds the tower contract with Al Yamamah Steel.
- Tower and mast imports fell from $91.4m in 2024 to $57.2m in 2025; China accounted for almost all recorded turbine-set imports in 2025.
- Who can release a fabrication order, and when a local tower earns its premium.
3.7 GW
Combined generating capacity at Starah, Shaqra and Yanbu, all under construction.
Download the PDF (free, no sign-up) (PDF, opens in a new tab)
8 pages · in English · published 24 November 2026
Sources: Goldwind · Windey · JBIC · Al Yamamah Steel (Saudi Exchange) · ACWA · UN Comtrade Plus · LCGPA
The PDF lists every source, with links and the dates they were retrieved.
Related reports
Renewables investment and operations
How does SAR 30.87 billion of Saudi Arabia’s 15 GW round split by project?
October 2026 review. Five solar plants and two wind farms make up the SAR 30.87bn round, and wind carries the highest investment per MW. Earlier solar plants and three storage agreements take the wider project list to SAR 46.48bn.
Renewables investment and operations
Who will run and maintain the 12 GW of Saudi solar coming into operation in 2027 and 2028?
October 2026 review. ACWA’s five solar plants reach full commercial operation in two waves of 6 GW, in Q4 2027 and Q1 2028. Fourteen grid-connected plants already account for 11.913 GW and need field support now.
Renewables investment and operations
How much capital does a gigawatt of Saudi solar take?
Reconcile installed capacity with the capital committed to five Saudi solar projects.